Skip to main content

Efficient breaking with Epiroc hammers

Epiroc says that its latest premium SB series hydraulic breakers are the only hammers on the market equipped as standard with an integrated channel for water spraying. This integrated water channel means that operators can spray water at the source of dust generation to keep dust levels down. The system improves the working environment, boosts visibility and prevents dust from seeping into the bushings. The SB breakers also reduce noise and vibration. Designed for carriers weighing from 0.7-24tonnes, the
July 20, 2018 Read time: 2 mins
The new wheel saw from Doosan Bobcat is said to be tough and durable
8737 Epiroc says that its latest premium SB series hydraulic breakers are the only hammers on the market equipped as standard with an integrated channel for water spraying.


This integrated water channel means that operators can spray water at the source of dust generation to keep dust levels down. The system improves the working environment, boosts visibility and prevents dust from seeping into the bushings. The SB breakers also reduce noise and vibration.

Designed for carriers weighing from 0.7-24tonnes, the SB series breakers are suitable for a wide range of applications. The SB series breakers are said to combine efficiency and performance with high durability in a compact design. The range includes models with service weights from 55kg for the SB 52, the smallest breaker of the SB series, to 1,060kg for the SB 1102.

The units benefit from the Epiroc EnergyRecovery technology, which absorbs recoil energy, increasing overall performance. The firm says that this allows a higher impact rate from the same hydraulic input with less vibration. The SB SolidBody concept uses a patented internal design integrating impact mechanism and guide system into a single piece. This eliminates the weakest components of traditional breakers: damping and guiding elements, tie rods, parting lines and stud bolts.

For more information on companies in this article

Related Content

  • Testing high performance road markings
    February 9, 2012
    High performance markings are among the safety products used to guide traffic safely, but they must be tested and checked. Patrick Smith reports. Road construction zones, zebra crossings, tunnels and areas with frequent fog are particular focal points with regard to road user safety. This is why manufacturers, authorities and contractors are always eager to use innovative road markings and special studs or, where necessary, lane control devices to assist both drivers and pedestrians in all conditions, parti
  • Rockmore International introduces A Series DTH hammers
    January 6, 2017
    Global manufacturer of percussive rock drilling tools Rockmore International has added the ROK 600A and 650A to its ROK series DTH hammer product line. The 600A and 650A are 6inch (152.4mm) class DTH hammers that are the first models in the newly-emerging A Class hammer range from Rockmore. The A hammers feature new component designs that are said to demonstrate better performance and penetration rates suited to smaller compressors. “We are committed to developing new DTH hammer solutions that increase prod
  • Road repairs fuel demand for milling machines
    February 13, 2012
    A need for road repairs is fuelling demand for new milling machines, Mike Woof reports. With many roads in Europe and North America needing repairs, manufacturers continue to meet demand by offering improved compact milling machines, as well as full-sized planers. The versatile and manoeuvrable compact machines can play a useful role in on-site recycling jobs for urban road improvements while the larger mills can be vital for in-situ recycling work.
  • Indeco cuts up New York City’s old Kosciuszko Bridge
    November 23, 2017
    An Indeco ISS 45/90 is proving essential for demolishing the old Kosciuszko Bridge in New York City. New York City’s old 1.9km Kosciuszko Bridge, which crosses Newtown Creek connecting Green Point, Brooklyn with Maspeth, Queens, has been out of service since April. By the end of the year, the polygonal Warren through-truss structure will be no more. To replace the old bridge, in 2009, the New York State Department of Transportation planned the construction of two cable-stayed replacement bridges.