Skip to main content

Dusting down

An innovative new product, SD605, is said to help boost safety by cutting dust levels during manufacturing of pre-cast concrete products. The US-developed product can also be used for dust control in construction, roadway, haul road, erosion and soil stabilisation applications.
April 16, 2012 Read time: 2 mins
An innovative new product, SD605, is said to help boost safety by cutting dust levels during manufacturing of pre-cast concrete products. The US-developed product can also be used for dust control in construction, roadway, haul road, erosion and soil stabilisation applications. Developed by 1406 NaEx Corp, SD605 is an economical water applied complex co-polymer that contains a patented super surfactant which allows for deep penetration into the dust bed and soil. When applied with water the product develops a hardened surface with a penetration of up to 254-356mm in heavy dust conditions. This is important where light powdery dust problems occur, as the product forms a more rigid substructure by attracting and combining the dust particles. Surface traffic compresses the dust and product mix to form a denser matrix, which provides long term control. Controlling dust with water trucks alone requires multiple trips to maintain moisture and is costly and time consuming. Using SD605 will save costs by reducing personnel and water needs. After the first application of SD605, only an occasional maintenance application is required to maintain proper product level in the dust bed. The SD605 deep penetrating soil stabilisation product is said to be important for construction projects, where dust pollution can result in fines and costly work stoppages.

For more information on companies in this article

Related Content

  • Bitumen technology: cutting maintenance costs
    April 8, 2022
    Thicklift in Utah, epoxy modification for Ethiopia and inbuilt de-icing in South Korea - a focus on technologies designed to lower maintenance and rehabilitation costs over the life of a pavement
  • Engineering the Saadiyat Expressway
    February 24, 2012
    A new bridge, said to be the largest in the United Arab Emirates (UAE) in terms of area, is being constructed as part of a major highway project. The US$550 million Saadiyat Expressway project, which involves Leighton Construction (Abu Dhabi), related to one of Australia's largest contracting groups, in constructing a ten-lane, 6.5km long highway to link the UAE's main city, with an exclusive island lying just offshore.
  • Energy absorbing safety barrier
    March 9, 2012
    Barrier Systems says that its new tensioned barrier offers high energy absorbing capabilities in head-on collisions. The company says that this is because the X-Tension technology is a tension-based solution rather than compression-based. The new range delivers good performance in these applications, as energy is absorbed with resistance at the impact head rather than being transferred down the rail as occurs with other systems. Even high-angle (15° during testing) impacts on the nose resulted in the vehicl
  • Recycled organic compost stabilises embankments
    February 21, 2012
    Waste & Resources Action Programme (WRAP) is a UK government-funded body designed to encourage greater resource efficiency. This body completed a trial with contractor Balfour Beatty and the Highways Agency to test the innovative use of recycled organic compost along roadside embankments.