Skip to main content

Dusting down

An innovative new product, SD605, is said to help boost safety by cutting dust levels during manufacturing of pre-cast concrete products. The US-developed product can also be used for dust control in construction, roadway, haul road, erosion and soil stabilisation applications.
April 16, 2012 Read time: 2 mins
An innovative new product, SD605, is said to help boost safety by cutting dust levels during manufacturing of pre-cast concrete products. The US-developed product can also be used for dust control in construction, roadway, haul road, erosion and soil stabilisation applications. Developed by 1406 NaEx Corp, SD605 is an economical water applied complex co-polymer that contains a patented super surfactant which allows for deep penetration into the dust bed and soil. When applied with water the product develops a hardened surface with a penetration of up to 254-356mm in heavy dust conditions. This is important where light powdery dust problems occur, as the product forms a more rigid substructure by attracting and combining the dust particles. Surface traffic compresses the dust and product mix to form a denser matrix, which provides long term control. Controlling dust with water trucks alone requires multiple trips to maintain moisture and is costly and time consuming. Using SD605 will save costs by reducing personnel and water needs. After the first application of SD605, only an occasional maintenance application is required to maintain proper product level in the dust bed. The SD605 deep penetrating soil stabilisation product is said to be important for construction projects, where dust pollution can result in fines and costly work stoppages.

For more information on companies in this article

Related Content

  • Brisbane’s Airport: Innovative Management of One of the World’s Busiest Runways
    June 26, 2014
    When it comes to runways, there are few busier then Brisbane’s main runway. Servicing both domestic and international travel, with over 200,000 movements per year, operating without a curfew Brisbane’s main runway is the busiest in Australia. For maintenance, crews only have a limited period of time to determine the pavement condition, normally during the night, making the detection of pavement faults difficult. To resolve this issue, a new high speed pavement scanner was used to rapidly survey the pavem
  • Asphalt plant operators offer fuel for thought
    August 28, 2013
    Asphalt plant operators across continental Europe are said to be increasingly turning to pulverized lignite to fuel or partially fuel production, while leading plant manufacturers have been busy closing key deals with customers in Russia, Bangladesh and Switzerland. Guy Woodford reports. Financially astute asphalt plant operators in Europe are said to be increasingly using pulverized lignite, also known as brown coal, from Germany to fuel or partially fuel production. Under the product name ‘Lignite Energ
  • New concrete testing technologies improve speed, safety and quality
    July 8, 2016
    Developments in data processing and management are revolutionising the way concrete strengths can be measured and used to improve efficiencies - Kristina Smith reports on two new technologies A new system that uses thermal imaging to measure the strength of sprayed concrete tunnel linings is being trialled for the first time in London. The brainchild of Dr Benoit Jones, managing director of Inbye Engineering, the technique could lead to improvements in safety, quality and – in the longer run – productivi
  • Rebuilding a scenic route in South Africa
    April 20, 2018
    Equipment from Wirtgen has played a key role in the rehabilitation of a major route in Cape Town. The scenic Camps Bay Drive provides access to Camps Bay and Hout Bay Based on the project brief and geometric analysis, Camps Bay Drive required widening to cope with high volumes of tourist traffic and MyCiti buses. In order to minimise the impact on traffic, the design brief targeted construction outside the summer peak tourist season and also required investigation into shortened construction periods. The