Doka’s fine form

Doka’s SKE50 automatic climbing formwork are being used on two suspension towers for a new multi-lane cable-stayed bridge alongside an older viaduct in Zaporozhye, south-east Ukraine. On completion, this large-scale infrastructure project is set to massively reduce the traffic burden on the existing bridge and significantly improve the daily traffic situation at what is a major river crossing. The two separate roadway slabs are cable-stayed off twin H-shaped suspension towers 150metres high. Lead project co
June 18, 2012 Read time: 3 mins
Doka formwork is being used on two suspension towers for the new multi-lane cable-stayed bridge in Zaporozhye, Ukraine
203 Doka’s SKE50 automatic climbing formwork are being used on two suspension towers for a new multi-lane cable-stayed bridge alongside an older viaduct in Zaporozhye, south-east Ukraine.

On completion, this large-scale infrastructure project is set to massively reduce the traffic burden on the existing bridge and significantly improve the daily traffic situation at what is a major river crossing. The two separate roadway slabs are cable-stayed off twin H-shaped suspension towers 150metres high. Lead project contractor Mostobud are said to have chosen Doka for its smooth cooperation on previous builds, topped by what it saw as the firm’s acclaimed competence on technologically challenging automatic climbing projects.

For the sake of strength, the two suspension towers are of solid cross-section to the full height of the first two concreting sections. The section is hollow from the 11metre level up. Per tower leg there are eight SKE50 automatic climbers carrying 100 m² of Doka Top 50 beam formwork, plus a set of Doka shaft formwork, repositioned with a single lift of the crane.

“The Doka formwork has proved the perfect solution for building the two suspension towers quickly and economically,” says project manager Volodymyr Klymenko.

Up to where the cross-beam ties in at the sixth concreting section, the legs of the towers are inclined at an angle of 5.3° off the vertical. Above that beam level, the tower legs are climbed at an angle of 5.6°. The polygonal cross-section tapers 5cms per concreting section. Aggregated over the total of 40 concreting sections, that equates to a difference of 2metres between the first and last sections in the towers’ tapering cross-section.

The hollow-section cross-beam is 6metres high and 20metres long to carry the roadway slab and is formed with Doka Top 50 large area formwork. This formwork is supported at a height of around 25metres by easy-to-use, easily erected Staxo 100 load-bearing towers. The integrated ladderways and a multiplicity of attachment options for personal protective equipment are said to enable the falsework towers to be erected rapidly, yet also in total safety. Starting from the top surface of the cross-beam, the automatic climbing platforms are set to the new angle of 5.6° from the vertical. A catwalk, suspended from the self-climbing system, forms another connecting link between the two legs of the tower. The walkway means that per tower, one passenger hoist is enough to bring the crew to their workplaces. The catwalk is said to be a special solution developed specifically for the build by Doka.

For more information on companies in this article

Related Content

  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours
  • Major bridge construction on Denmark's road project
    April 20, 2012
    Doka is playing a leading role in Denmark’s first ever public private partnership roadbuilding project. The 26km long, four-lane M51, 15km from the German border, will link Kliplev and Sønderborg in southern Jutland. And Doka will be the sole provider offormwork for the concrete used in erecting the motorway’s 72 bridges and crossings. The M51 is using 9000m² of the extremely adaptable Large-area formwork Top 50, and more than 4,750 basic frames of the heavyduty Load-bearing tower Staxo 100 system.
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • Czech bridge sees world formwork debut
    July 23, 2012
    The Czech government is investing heavily in upgrading and modernising the country's top-tier transportation infrastructure. This year alone, building works with a total investment of over E1.6 billion are planned or underway on the Czech motorway and main road network. Completion of the D8 motorway between the Czech capital Prague and Dresden in the east of Germany has a high priority, and as part of this large-scale project, the contracting consortium of SMP and Metrostav is erecting the 585m long Prosmyk