Skip to main content

Doka’s fine form

Doka’s SKE50 automatic climbing formwork are being used on two suspension towers for a new multi-lane cable-stayed bridge alongside an older viaduct in Zaporozhye, south-east Ukraine. On completion, this large-scale infrastructure project is set to massively reduce the traffic burden on the existing bridge and significantly improve the daily traffic situation at what is a major river crossing. The two separate roadway slabs are cable-stayed off twin H-shaped suspension towers 150metres high. Lead project co
June 18, 2012 Read time: 3 mins
Doka formwork is being used on two suspension towers for the new multi-lane cable-stayed bridge in Zaporozhye, Ukraine
203 Doka’s SKE50 automatic climbing formwork are being used on two suspension towers for a new multi-lane cable-stayed bridge alongside an older viaduct in Zaporozhye, south-east Ukraine.

On completion, this large-scale infrastructure project is set to massively reduce the traffic burden on the existing bridge and significantly improve the daily traffic situation at what is a major river crossing. The two separate roadway slabs are cable-stayed off twin H-shaped suspension towers 150metres high. Lead project contractor Mostobud are said to have chosen Doka for its smooth cooperation on previous builds, topped by what it saw as the firm’s acclaimed competence on technologically challenging automatic climbing projects.

For the sake of strength, the two suspension towers are of solid cross-section to the full height of the first two concreting sections. The section is hollow from the 11metre level up. Per tower leg there are eight SKE50 automatic climbers carrying 100 m² of Doka Top 50 beam formwork, plus a set of Doka shaft formwork, repositioned with a single lift of the crane.

“The Doka formwork has proved the perfect solution for building the two suspension towers quickly and economically,” says project manager Volodymyr Klymenko.

Up to where the cross-beam ties in at the sixth concreting section, the legs of the towers are inclined at an angle of 5.3° off the vertical. Above that beam level, the tower legs are climbed at an angle of 5.6°. The polygonal cross-section tapers 5cms per concreting section. Aggregated over the total of 40 concreting sections, that equates to a difference of 2metres between the first and last sections in the towers’ tapering cross-section.

The hollow-section cross-beam is 6metres high and 20metres long to carry the roadway slab and is formed with Doka Top 50 large area formwork. This formwork is supported at a height of around 25metres by easy-to-use, easily erected Staxo 100 load-bearing towers. The integrated ladderways and a multiplicity of attachment options for personal protective equipment are said to enable the falsework towers to be erected rapidly, yet also in total safety. Starting from the top surface of the cross-beam, the automatic climbing platforms are set to the new angle of 5.6° from the vertical. A catwalk, suspended from the self-climbing system, forms another connecting link between the two legs of the tower. The walkway means that per tower, one passenger hoist is enough to bring the crew to their workplaces. The catwalk is said to be a special solution developed specifically for the build by Doka.

For more information on companies in this article

Related Content

  • Bolivia’s new highway
    October 10, 2017
    Bolivia’s new highway will provide better access into mountain areas – Mauro Nogarin writes At the beginning of 2015, work began on the construction and paving for the Tupiza - Atocha - Uyuni highway project. The route is located in Bolivia’s Potosí department: it is 189m in length and forms part of the Southwest Basic Road Network (RVF) of Bolivia. The completion of this important route is requiring funding worth US$150 million, of which 72% is being delivered through loans from the European Investment
  • Building Egypt's world class Desert Highway
    February 9, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports
  • Building Egypt's world class Desert Highway
    May 3, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong