Skip to main content

Doka feels the heat in Qatar orbital highway project

The FIFA World Cup 2022 in Qatar is getting closer so completing major infrastructure projects on time has been a priority for the government. The Gulf state is also in the midst of its Qatar National Vision 2030, launched in 2008 with the aim to "transform Qatar into an advanced society capable of achieving sustainable development" by 2030. Improving infrastructure will help the country of just under 3 million people attain greater social and economic levels, according to the government. Finishing critic
September 19, 2019 Read time: 2 mins
Orbital highway around the Qatari capital
The FIFA World Cup 2022 in Qatar is getting closer so completing major infrastructure projects on time has been a priority for the government.


The Gulf state is also in the midst of its Qatar National Vision 2030, launched in 2008 with the aim to "transform Qatar into an advanced society capable of achieving sustainable development" by 2030. Improving infrastructure will help the country of just under 3 million people attain greater social and economic levels, according to the government.

Finishing critical projects on time is essential for the government’s strategy, such as the orbital highway around the capital city Doha. The country’s Public Works Authority - 2559 Ashghal – wanted construction equipment, personnel and material to reach their various infrastructure project sites without causing traffic congestion on major and minor roads.

Having tendered the project in May 2014, the contract was awarded as a joint venture between QDVC and Bin Omran Trading & Contracting. The scope of the project involved connecting the Salwa Road to the North Relief Road with 47km of highway. This includes five dual lanes for light vehicles, two dual lanes for heavy goods and industrial vehicles, six viaducts as well as 17 bridges and underpasses.

As a massive project with multiple structures, 203 Doka was faced with a tight delivery window meaning a pre-assembly strategy was to be essential. It included the special electric stripping devices for bridge deck formwork, HEB1000 steel beam grill and special steel parts such as adjustable plates and fixing collars for the piers. Doka created shoring configurations and panels using combinations such as Staxo 100 eco with steel profiles, Top 50, D3 and SL-1 HD shoring. This was one of the reasons why the engineering work including on-site supervision on the project exceeded 20,000 hours.


In the preparation phase, Doka calibrated elements such as the shoring erection sequence, weight to be carried, integrated safety equipment on the material, access to the work area and dismantling sequence. Some of the value-added elements used by the Doka team included 3D modelling, screw-jack extensions for each shoring tower made with AutoLISP and wood boxes cut by CNC machining.

For more information on companies in this article

Related Content

  • PPRS: the positive side of structural failures
    March 27, 2018
    You learn from your failures, not your successes. That was the overall message for delegates during the day-two morning session on the impact of engineering structural failures. These lessons are also too often “painful”, said Anne-Marie Leclerq, deputy minister for infrastructure within the ministry of transport for the Canadian province of Quebec. On September 30, 2006, a span of the six-lane Concorde Bridge in Laval, near Montreal, collapsed crushing to death five people and injuring six. Only recently
  • Peri’s formwork and shoring solution for the “East End Crossing”
    July 6, 2016
    Pylons almost 90m high are a striking feature of a new cable-stayed East End Crossing bridge over the Ohio River in Louisville, Kentucky state in the US The pylons are characterised by their complex shapes and massive legs and cross beams. Peri provided a comprehensive overall concept for its construction – consisting of a planning solution with perfectly matched formwork, climbing, shoring and scaffolding systems along with extensive on-site support. With a Peri solution, the construction crew were a
  • Doka formwork rises above the Orinoco River in Venezuela
    July 8, 2016
    Taking a road and rail link across one of the biggest rivers in South America, together with its swamps and flood-plain, called for a new crossing of truly superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River, at Caicara del Orinoco, in Venezuela took shape with a formwork solution and automatic climbing technology from Doka. The bridge has an overall length of just over 11km and the main bridge is nearly 2.3km long with the roadway 55m above the river. The two ident
  • The Cebu–Cordova Link Expressway
    September 19, 2021
    The 8.5km CCLEx, as it is known, will include the longest and tallest bridge in the Philippines when the structure is finished next year