Skip to main content

Doka feels the heat in Qatar orbital highway project

The FIFA World Cup 2022 in Qatar is getting closer so completing major infrastructure projects on time has been a priority for the government. The Gulf state is also in the midst of its Qatar National Vision 2030, launched in 2008 with the aim to "transform Qatar into an advanced society capable of achieving sustainable development" by 2030. Improving infrastructure will help the country of just under 3 million people attain greater social and economic levels, according to the government. Finishing critic
September 19, 2019 Read time: 2 mins
Orbital highway around the Qatari capital
The FIFA World Cup 2022 in Qatar is getting closer so completing major infrastructure projects on time has been a priority for the government.


The Gulf state is also in the midst of its Qatar National Vision 2030, launched in 2008 with the aim to "transform Qatar into an advanced society capable of achieving sustainable development" by 2030. Improving infrastructure will help the country of just under 3 million people attain greater social and economic levels, according to the government.

Finishing critical projects on time is essential for the government’s strategy, such as the orbital highway around the capital city Doha. The country’s Public Works Authority - 2559 Ashghal – wanted construction equipment, personnel and material to reach their various infrastructure project sites without causing traffic congestion on major and minor roads.

Having tendered the project in May 2014, the contract was awarded as a joint venture between QDVC and Bin Omran Trading & Contracting. The scope of the project involved connecting the Salwa Road to the North Relief Road with 47km of highway. This includes five dual lanes for light vehicles, two dual lanes for heavy goods and industrial vehicles, six viaducts as well as 17 bridges and underpasses.

As a massive project with multiple structures, 203 Doka was faced with a tight delivery window meaning a pre-assembly strategy was to be essential. It included the special electric stripping devices for bridge deck formwork, HEB1000 steel beam grill and special steel parts such as adjustable plates and fixing collars for the piers. Doka created shoring configurations and panels using combinations such as Staxo 100 eco with steel profiles, Top 50, D3 and SL-1 HD shoring. This was one of the reasons why the engineering work including on-site supervision on the project exceeded 20,000 hours.


In the preparation phase, Doka calibrated elements such as the shoring erection sequence, weight to be carried, integrated safety equipment on the material, access to the work area and dismantling sequence. Some of the value-added elements used by the Doka team included 3D modelling, screw-jack extensions for each shoring tower made with AutoLISP and wood boxes cut by CNC machining.

For more information on companies in this article

Related Content

  • UK construction firms eye 2022 FIFA World Cup Qatar projects
    June 27, 2012
    UK construction sector firms are being urged to attend an event outlining commercial opportunities linked to the development of US$140 billion worth of infrastructure projects in Qatar ahead of the Gulf state’s hosting of the 2002 FIFA World Cup. During MEED’s Qatar Infrastructure Projects conference, being held at the Jumeirah Carlton Tower Hotel in London from July 2-5, Middle East company formation experts The Links Group will provide insight to companies interested in entering the Qatari project market.
  • Kronprinsesse Marys Bro bridges Roskilde Fjord
    January 10, 2019
    A BESIX joint venture is giving the royal treatment to the new Kronprinsesse Marys Bro across Roskilde Fjord, writes David Arminas It was announced in September 2016 that Belgian group BESIX, in a joint venture (RBAI) with Italian firm Rizzani de Eccher and Spanish company Acciona Infraestructuras, had been chosen for the €133 million project. The award, by client Vejdirektoratet (Danish Road Directorate), marked the entry of BESIX into the Scandinavian market. Vejdirektoratet praised the winning bid as
  • Doka pushes into Asia and Middle East with load bearing tower d3
    February 10, 2016
    With the Load-bearing tower d3, Doka is expanding its product portfolio for Southeast Asia and the Middle East. Load-bearing tower d3 is a product enhancement of a successful Doka load-bearing system and combines the benefits of existing systems. The d3 is designed for particularly tall shoring heights and high loads. Applications are in building construction as well as civil and industrial construction. It is not required to dismantle and reassemble the shoring towers for repositioning and manual reposi
  • Doka pushes into Asia and Middle East with load bearing tower d3
    January 6, 2017
    With the Load-bearing tower d3, Doka is expanding its product portfolio for Southeast Asia and the Middle East. Load-bearing tower d3 is a product enhancement of a successful Doka load-bearing system and combines the benefits of existing systems. The d3 is designed for particularly tall shoring heights and high loads. Applications are in building construction as well as civil and industrial construction. It is not required to dismantle and reassemble the shoring towers for repositioning and manual reposi