Skip to main content

Compressor system reduces dust in tunnelling

Italian firm Indeco is now offering a novel compressor system that can be mounted on an excavator being used with a breaker in tunnelling operations.
April 5, 2012 Read time: 2 mins
The new compressor from Indeco can be fitted to any type of excavator requiring a water spray system for use with a breaker in a tunneling application
Italian firm 237 Indeco is now offering a novel compressor system that can be mounted on an excavator being used with a breaker in tunnelling operations. The compressor is designed to power water sprayers that help damp down dust that can be generated when breaking away rock from the face. Using the water spray system helps boost visibility for the excavator operator and allows for more efficient working. The water spray also prevents material build-ups from occurring on the breaker tool, which could result in additional wear, while it also eliminates the risk of contaminants from entering the hammer hydraulics and causing serious damage. In addition, this system improved the working conditions and safety levels inside the tunnel for any site personnel by eliminating the risk of inhaled particulates. The system can deliver a maximum water pressure of 150bars and delivers up to 15litres/min of water. The system features a novel spray design to ensure effective misting and maximise efficiency, and suits use with the Indeco HP5000, HP7000, HP9000 and HP12000 breakers.

The system is available as a standard feature for use on all excavators and suits tunnelling applications, as well as other duties such as quarrying or for pressurising breakers for underwater demolition. Indeco's marketing manager, Michele Vitulano explained, "Until now we were offering this on request for customers."

For more information on companies in this article

Related Content

  • Trimble’s new tools can boost drilling, piling and bucket weighing accuracy
    November 29, 2013
    Trimble is broadening its range of products with the introduction of its new DPS900 Drilling and Piling System and Business Center and the LOADRITE X2350 Payload Management System for excavators. According to the firm, the DPS900 Drilling and Piling system allows contractors to drill precisely at a specified location, to preset levels for depth, orientation and inclination angle. The HCE Drilling and Piling module is said to offer contractors tools to create optimised drilling and piling plans that can help
  • New US pavers coming to market
    July 7, 2022
    New US asphalt pavers are now coming to market
  • Ageing Liberty Tunnels in US refurbished with hydrodemolition
    May 13, 2015
    Hydrodemolition surface preparation keeps Liberty Tunnel rehabilitation project on schedule in Pittsburgh. The Pennsylvania state Department of Transportation selected hydrodemolition surface preparation for the US$18.8 million rehabilitation of Pittsburgh’s Liberty Tunnels. Time was of the essence to complete the project on deadline without penalties and hydrodemolition was selected as it offered a fast and cost-effective method to prepare the tunnel walls for a new, shotcrete surface. This methods off
  • Safer cone collection with X-Cone among the latest safety innovations
    August 30, 2017
    X-Cone is a new traffic cone management system offering a higher level of safety for workers and maximum efficiency for contractors. Austrian-made X-Cone is a truck-mounted system that can manage the setting out and collection of cones from the flatbed of any 3.5tonne vehicle. It does not matter if the cones are straight or laying on the road, the X-cone can still manage the work quickly, safely and reliably, according to the manufacturer. For setting out standard cones, the driver can decide the distance b