Skip to main content

Colombia concrete casting construction

Spanish specialist supplier Moldtech is supplying a concrete precasting plant to a customer in the Colombian city of Medellin. The deal is for the design, manufacture and commissioning of a complete factory for the production of bridge girders and precast concrete frames. This follows a visit by a technical team from Moldtech to Medellin to show the client its latest precast concrete plant technology. The new plant being erected will allow the client to supply bridge girders up to 45m in length and 2.2m
May 10, 2018 Read time: 2 mins
Spanish firm Moldtech is supplying a precasting plant to a client in Colombia
Spanish specialist supplier Moldtech is supplying a concrete precasting plant to a customer in the Colombian city of Medellin.


The deal is for the design, manufacture and commissioning of a complete factory for the production of bridge girders and precast concrete frames. This follows a visit by a technical team from Moldtech to Medellin to show the client its latest precast concrete plant technology.

The new plant being erected will allow the client to supply bridge girders up to 45m in length and 2.2m in height. This new facility will be composed of two adjacent buildings, covering an area of 3,125m2.

One of the buildings will house the prestressing heads, which will be equipped with the latest technologies in security and protection. The other buildings will house both the bridge girders and a set of fixed tables for the production of pre-slabs (70m) and buttress sides (50m).

In addition, Moldtech will supply as a complement to the integral project an MT20 System, machinery designed by Moldtech for modular manufacturing of drycast box culverts, with dimensions from 1x1m up to 3x3m. The concrete transport system will consist of two mobile machines with a screw conveyor system in the top side, also manufactured by Moldtech.

Related Content

  • Building Egypt's world class Desert Highway
    February 9, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports
  • Building Egypt's world class Desert Highway
    May 3, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Podium finish for Indonesia’s new racetrack paver
    November 23, 2021
    The first machines to complete a circuit of Indonesia’s new Mandalika International motorsport track were a series of Bomag pavers and rollers. They can claim a best-in-class finish when it comes to creating the ultimate surface for a competitive racing track.