Skip to main content

Colombia concrete casting construction

Spanish specialist supplier Moldtech is supplying a concrete precasting plant to a customer in the Colombian city of Medellin. The deal is for the design, manufacture and commissioning of a complete factory for the production of bridge girders and precast concrete frames. This follows a visit by a technical team from Moldtech to Medellin to show the client its latest precast concrete plant technology. The new plant being erected will allow the client to supply bridge girders up to 45m in length and 2.2m
May 10, 2018 Read time: 2 mins
Spanish firm Moldtech is supplying a precasting plant to a client in Colombia
Spanish specialist supplier Moldtech is supplying a concrete precasting plant to a customer in the Colombian city of Medellin.


The deal is for the design, manufacture and commissioning of a complete factory for the production of bridge girders and precast concrete frames. This follows a visit by a technical team from Moldtech to Medellin to show the client its latest precast concrete plant technology.

The new plant being erected will allow the client to supply bridge girders up to 45m in length and 2.2m in height. This new facility will be composed of two adjacent buildings, covering an area of 3,125m2.

One of the buildings will house the prestressing heads, which will be equipped with the latest technologies in security and protection. The other buildings will house both the bridge girders and a set of fixed tables for the production of pre-slabs (70m) and buttress sides (50m).

In addition, Moldtech will supply as a complement to the integral project an MT20 System, machinery designed by Moldtech for modular manufacturing of drycast box culverts, with dimensions from 1x1m up to 3x3m. The concrete transport system will consist of two mobile machines with a screw conveyor system in the top side, also manufactured by Moldtech.

Related Content

  • Inter-oceanic Corridor for Brazil-Bolivia-Chile
    March 2, 2015
    A new Bolivian link is playing a key role in a major Latin American highway – Mauro Nogarin reports. Construction of a new route through Bolivia will help deliver improved transport between Latin America’s Pacific and Atlantic coasts. The construction of the highway between Santa Barbara-Caranavi-Quiquibey has been carried out by the consortium ARBOL. This firm is a partnership between the Argentinean company Grupo Eling and Administradora de Caminos Boliviana (ABC). The stretch of highway is an important s
  • Advanced concrete slipforming technology coming to market
    August 1, 2019
    New concrete slipforming technology is said to offer increased performance over earlier generation equipment - Mike Woof writes
  • Mullum Mullum Valley untouched by progress
    July 20, 2012
    Preserving the unspoiled Mullum Mullum Valley was the major consideration when deciding to build a traffic tunnel The answer to one of the major issues facing construction of the A$2.5 billion EastLink route in Australia was simple: construct a tunnel. While it was expensive, those involved realised they had little option but to go underground to protect the environmentally sensitive Mullum Mullum Valley, an untouched area of wood and bushland in Melbourne. EastLink, the 39km toll road project on the easter
  • Indeco cuts up New York City’s old Kosciuszko Bridge
    November 23, 2017
    An Indeco ISS 45/90 is proving essential for demolishing the old Kosciuszko Bridge in New York City. New York City’s old 1.9km Kosciuszko Bridge, which crosses Newtown Creek connecting Green Point, Brooklyn with Maspeth, Queens, has been out of service since April. By the end of the year, the polygonal Warren through-truss structure will be no more. To replace the old bridge, in 2009, the New York State Department of Transportation planned the construction of two cable-stayed replacement bridges.