Skip to main content

Colombia concrete casting construction

Spanish specialist supplier Moldtech is supplying a concrete precasting plant to a customer in the Colombian city of Medellin. The deal is for the design, manufacture and commissioning of a complete factory for the production of bridge girders and precast concrete frames. This follows a visit by a technical team from Moldtech to Medellin to show the client its latest precast concrete plant technology. The new plant being erected will allow the client to supply bridge girders up to 45m in length and 2.2m
May 10, 2018 Read time: 2 mins
Spanish firm Moldtech is supplying a precasting plant to a client in Colombia
Spanish specialist supplier Moldtech is supplying a concrete precasting plant to a customer in the Colombian city of Medellin.


The deal is for the design, manufacture and commissioning of a complete factory for the production of bridge girders and precast concrete frames. This follows a visit by a technical team from Moldtech to Medellin to show the client its latest precast concrete plant technology.

The new plant being erected will allow the client to supply bridge girders up to 45m in length and 2.2m in height. This new facility will be composed of two adjacent buildings, covering an area of 3,125m2.

One of the buildings will house the prestressing heads, which will be equipped with the latest technologies in security and protection. The other buildings will house both the bridge girders and a set of fixed tables for the production of pre-slabs (70m) and buttress sides (50m).

In addition, Moldtech will supply as a complement to the integral project an MT20 System, machinery designed by Moldtech for modular manufacturing of drycast box culverts, with dimensions from 1x1m up to 3x3m. The concrete transport system will consist of two mobile machines with a screw conveyor system in the top side, also manufactured by Moldtech.

Related Content

  • Wolffkran leads the pack
    December 10, 2024
    At present, the two WOLFF 7534.16 Clear cranes are drawing a lot of attention near Horb in Germany’s Neckar Valley
  • PERI fills gap in Greek market
    February 19, 2013
    A team of Greek and German PERI engineers have developed a comprehensive formwork and scaffolding solution for the T4 bridge on the A7 motorway in Greece. The 160km long A7 connects Kalamata in the south to Corinth in the northwest of the Peloponnese peninsula. On one stretch of the motorway a 390m long arched bridge – known as T4 – is being used to close the gap between Paradisia and Tsakona. Set for completion in early 2014, two-thirds of the 22m wide bridge superstructure will be suspended on a steel arc
  • Fast-track Biloxi Bay bridge
    July 18, 2012
    Construction of a bridge destroyed in a hurricane was completed early, and with some added aesthetic benefits Hurricane Katrina, one of the deadliest and costliest natural disasters in US history, made landfall on 29 August, 2005, devastating the Gulf Coast. The US 90 Bridge over Biloxi Bay (connecting the communities of Biloxi and Ocean Springs, Mississippi) was one of many major highway and railroad bridges knocked out of service due to extensive storm damage. The eye of the storm passed 96km west of Bilo
  • Concrete paving technology offers long term roadway construction
    July 18, 2012
    Concrete slipforming technology offers long term roadway and barrier construction with new technology now available - Mike Woof reports With road construction investment being seen around the world, concrete slipformer manufacturers are seeing strong export sales at present. New models are coming to market also with manufacturers continuing to broaden ranges by offering additional features and capabilities. US concrete paving specialist GOMACO is benefiting from extensive worldwide sales, with its long term