Skip to main content

Colombia concrete casting construction

Spanish specialist supplier Moldtech is supplying a concrete precasting plant to a customer in the Colombian city of Medellin. The deal is for the design, manufacture and commissioning of a complete factory for the production of bridge girders and precast concrete frames. This follows a visit by a technical team from Moldtech to Medellin to show the client its latest precast concrete plant technology. The new plant being erected will allow the client to supply bridge girders up to 45m in length and 2.2m
May 10, 2018 Read time: 2 mins
Spanish firm Moldtech is supplying a precasting plant to a client in Colombia
Spanish specialist supplier Moldtech is supplying a concrete precasting plant to a customer in the Colombian city of Medellin.


The deal is for the design, manufacture and commissioning of a complete factory for the production of bridge girders and precast concrete frames. This follows a visit by a technical team from Moldtech to Medellin to show the client its latest precast concrete plant technology.

The new plant being erected will allow the client to supply bridge girders up to 45m in length and 2.2m in height. This new facility will be composed of two adjacent buildings, covering an area of 3,125m2.

One of the buildings will house the prestressing heads, which will be equipped with the latest technologies in security and protection. The other buildings will house both the bridge girders and a set of fixed tables for the production of pre-slabs (70m) and buttress sides (50m).

In addition, Moldtech will supply as a complement to the integral project an MT20 System, machinery designed by Moldtech for modular manufacturing of drycast box culverts, with dimensions from 1x1m up to 3x3m. The concrete transport system will consist of two mobile machines with a screw conveyor system in the top side, also manufactured by Moldtech.

Related Content

  • Quantm is making Trimble one of the world’s leading BIM market challengers
    December 19, 2016
    When Trimble first launched its Quantm software system a decade or so ago, the company was making an important step into end-to-end BIM modelling. The rules of the game were changing fast. Adrian Greeman reports When survey and machine control equipment maker Trimble bought the Australian road planning software system Quantm in 2006 it might not have realised quite what it was leading to. A decade later, Quantm is helping to put Trimble among the big players in the BIM (building information modelling) en
  • McCloskey Washing Systems eyes rapid growth
    March 9, 2017
    McCloskey Washing Systems (MWS) is targeting rapid growth after unveiling the Sandstorm 620 modular wash plant – the first of six new models the company has in production just 12 months after its launch. The Sandstorm range – 516, 620 and 824 – incorporates feeding, screening, aggregate and sand washing along with stockpiling all products on a single compact modular chassis.
  • Rockster Recycler rocks in Connecticut state
    April 16, 2018
    The first live US demonstration of Rockster’s new impact crusher R1000S took place at a recent demonstration day by Equip Sales and Leasing in Connecticut state. The R1000S was one of eight different machines from Austrian manufacturer Kormann Rockster Recycler that were on show during the Live Crushing Demo Day at a quarry of Equip Saels’s sister company Modern Materials. Equip Sales has sold many Rockster units into the US and Bermuda, off the south-east coast, since they started working together in 200
  • Concrete surface for runway paving job
    January 18, 2016
    The Fort Lauderdale-Hollywood International Airport in Broward County, Florida, was suffering departure delays on every single flight. The existing 9R-27L runway was too short at 1615m in length, affecting capacity at the airport. To deal with the issue, the Broward County Board of County Commissioners created a plan to extend the southern runway to 2438m to accommodate larger commercial aircraft. The project was not simple however and could not be achieved by tearing out the existing runway and buil