Skip to main content

Central Alliance launches Geo Construction division

Central Alliance, a pre-construction services company based in northern England, has set up a geotechnical division called Geo Construction. The company’s investment in the new division includes acquisition of specialist drilling contractor Electro Install that focuses on geotechnical and slope climbing proficiencies. Electro Install’s rigs have full body and mast rotation, enabling Central Alliance to carry out ground investigation in the same orientation and location as proposed remedial works such as
December 19, 2017 Read time: 2 mins
Central Alliance has all the angles covered

8653 Central Alliance, a pre-construction services company based in northern England, has set up a geotechnical division called Geo Construction.

The company’s investment in the new division includes acquisition of specialist drilling contractor Electro Install that focuses on geotechnical and slope climbing proficiencies.

Electro Install’s rigs have full body and mast rotation, enabling Central Alliance to carry out ground investigation in the same orientation and location as proposed remedial works such as soil nailing or Electrokinetic slope stabilisation techniques. The company said that this will significantly minimise the risk of unforeseen ground conditions and provide valuable data to inform more accurate pricing and methodology for construction.

The fleet of specialist slope access rigs, combined with Central Alliance’s other surveying techniques including unmanned aerial systems and multiplatform mobile mapping solutions, can be used across the construction industry from highways and energy work to residential developments.

Central Alliance said that it is already working on projects using the specialist slope climbing rigs, said group technical director Richard Pidcock who is heading up Geo Construction. Pidcock has more than 20 years in geotechnical related fields.

Central Alliance has just completed ground investigation work on the nearly €1.7 billion A14 highway improvement scheme at Brampton Hut, in the county of Cambridgeshire, for co-clients Amey and the government agency Highways England.

For more information on companies in this article

Related Content

  • Advances in geosynthetics boost soil stabilisation
    March 13, 2012
    Special fabrics are often used in civil engineering works, including highways, to make soil stronger Geosynthetics have been used in roadway construction for thousands of years with natural materials being mixed with soil to improve quality and stability. While today's products are much more sophisticated, the principles are the same. For example, when used with soil, geotextiles (permeable fabrics) can filter, separate, reinforce, protect, or drain, and they are often made from polypropylene or polyester,
  • SDS develops SuDS material to tackle highway metals pollution
    November 30, 2018
    SDS says that its engineered treatment media Aqua-Xchange can be used in regulatory-compliant sustainable drainage systems - SuDS. Delivered to site in lightweight 1m³ bags, it can be deployed as stormwater treatment in highways drainage, as well as on other higher risk locations such as retail car parks, freight and logistics hubs. SDS claims that independent tests have shown its Aqua-Xchange removes 99% of dissolved copper and zinc, toxic metals identified by Highways England as priority pollutants
  • SDS develops SuDS material to tackle highway metals pollution
    November 30, 2018
    SDS says that its engineered treatment media Aqua-Xchange can be used in regulatory-compliant sustainable drainage systems - SuDS. Delivered to site in lightweight 1m³ bags, it can be deployed as stormwater treatment in highways drainage, as well as on other higher risk locations such as retail car parks, freight and logistics hubs. SDS claims that independent tests have shown its Aqua-Xchange removes 99% of dissolved copper and zinc, toxic metals identified by Highways England as priority pollutants
  • Progression in concrete plant and mixing solutions
    July 14, 2014
    Big orders for and progress in plant and concrete mixing technology has been continuing at a rapid pace over recent months, as Guy Woodford reports Shantui recently completed an eye-catching US$3.2 million deal with a customer in the United Arab Emirates for 50 concrete mixer trucks. The deal is said to be an important breakthrough for the Chinese company’s concrete machinery in the Middle East market, raising brand awareness and laying a solid foundation for building market share. Over the past y