Skip to main content

Central Alliance launches Geo Construction division

Central Alliance, a pre-construction services company based in northern England, has set up a geotechnical division called Geo Construction. The company’s investment in the new division includes acquisition of specialist drilling contractor Electro Install that focuses on geotechnical and slope climbing proficiencies. Electro Install’s rigs have full body and mast rotation, enabling Central Alliance to carry out ground investigation in the same orientation and location as proposed remedial works such as
December 19, 2017 Read time: 2 mins
Central Alliance has all the angles covered

8653 Central Alliance, a pre-construction services company based in northern England, has set up a geotechnical division called Geo Construction.

The company’s investment in the new division includes acquisition of specialist drilling contractor Electro Install that focuses on geotechnical and slope climbing proficiencies.

Electro Install’s rigs have full body and mast rotation, enabling Central Alliance to carry out ground investigation in the same orientation and location as proposed remedial works such as soil nailing or Electrokinetic slope stabilisation techniques. The company said that this will significantly minimise the risk of unforeseen ground conditions and provide valuable data to inform more accurate pricing and methodology for construction.

The fleet of specialist slope access rigs, combined with Central Alliance’s other surveying techniques including unmanned aerial systems and multiplatform mobile mapping solutions, can be used across the construction industry from highways and energy work to residential developments.

Central Alliance said that it is already working on projects using the specialist slope climbing rigs, said group technical director Richard Pidcock who is heading up Geo Construction. Pidcock has more than 20 years in geotechnical related fields.

Central Alliance has just completed ground investigation work on the nearly €1.7 billion A14 highway improvement scheme at Brampton Hut, in the county of Cambridgeshire, for co-clients Amey and the government agency Highways England.

For more information on companies in this article

Related Content

  • Highways England awards €2.1 billion of upgrades for UK motorways
    August 7, 2015
    Highways England has today appointed six joint-venture companies to design and build 10 “smart motorways” as part of a €2.1 billion investment. Construction contractors appointed are the Balfour Beatty and VINCI joint venture, a Costain and Galliford Try joint venture, as well as a Carillion and Kier joint venture. Designers are a CHM2 and Hyder joint venture, an Amey and Arup joint venture, as well as a Jacobs and Atkins joint venture. The award is the second major procurement to be given under th
  • New tunnel contract format published
    May 7, 2019
    The International engineering federation FIDIC (the International Federation of Consulting Engineers) and ITA-AITES (the International Tunnelling and Underground Space Association) are jointly publishing a new form of contract for tunnelling and underground works. Called The Emerald Book, this new contract form is intended to meet developments in the fast-growing underground market sector. The new Conditions of Contract for Underground Works (The Emerald Book) is expected to be widely used. Underground cons
  • England’s A14 project River Great Ouse Viaduct completed
    February 28, 2019
    Construction of the biggest bridge in Highways England’s €1.73 billion A14 Cambridge-to-Huntingdon upgrade has been completed. The River Great Ouse Viaduct stretches for 0.8km and when opened to traffic next year will take the new A14 road over the floodplain and the East Coast Mainline Railway line. Work began in November 2016 on the bridge that is part of a new 27.4km bypass under construction to the south of Huntingdon and away from the existing A14. The road is being widened to three lanes in both
  • CTB forges ahead with Naylor Denlok pipes under A556 upgrade
    September 30, 2016
    Recent trenchless installation of surface water drainage pipes was used underneath a UK road improvement scheme to allow highway upgrades to proceed unimpeded The A556 Knutsford to Bowdon Improvement Scheme, being undertaken by Costain for its client Highways England, is valued between €197 million and nearly €265 million. The 7.5km section will transform the A556 trunk road between the towns of Knutsford and Bowdon into a modern dual carriageway. Costain will also be making the existing A556 into a single