Skip to main content

Canadian air

Compressors from Atlas Copco are proving highly useful in highly diverse applications, on a bridge project and a quarry in Canada. Water ingress over 30 years has damaged a road bridge in Quebec City, Canada, deteriorating the concrete and breaking down the rubber expansion joints at both ends of the 150m long structure. City highway authority, Transportes Quebec, awarded local contracting company Inter-Structures the contract to replace the deteriorated concrete and fit new membrane seals. The bridge, clos
February 8, 2012 Read time: 3 mins
Compressors from 161 Atlas Copco are proving highly useful in highly diverse applications, on a bridge project and a quarry in Canada. Water ingress over 30 years has damaged a road bridge in Quebec City, Canada, deteriorating the concrete and breaking down the rubber expansion joints at both ends of the 150m long structure. City highway authority, Transportes Quebec, awarded local contracting company Inter-Structures the contract to replace the deteriorated concrete and fit new membrane seals. The bridge, close to the St Lawrence river and Quebec City, links highway 440 West and the Boulevard de Chutes to provide access to a residential area and the renown Montmorency park and waterfall.

To ensure access to the damaged seals across the full width of the bridge, the contractor has removed more than 300mm x 200mm x 200mm on each of the nine beams at both ends of the bridge and the 200mm thick concrete slab; relying on two Atlas Copco XAS185 air compressors, including a recently delivered unit on rental from Equipment LAV.

On the Inter-Structures project, both XAS 185 portable air compressors are supplying a free air delivery of 89litres/s at 7bars to each provide compressed air for three breakers.

Meanwhile a newly formed Canadian quarry drill and blast contractor, Forexplo, has taken delivery of a second Atlas Copco XRVS 1000 CD6 air compressor.

Formed at the beginning of the year, 2455 Forexplo has established itself as a drill and blast specialist in Canada's Quebec Province. A key factor in meeting the production targets, is the on-demand high pressure air provided by the two Atlas Copco compressors for two large drill rigs. The firm now has drill and blast contracts with Beauval for the quarries in Valleyfield, Ange Gardien, some 55km south of Montreal and Herbertville on Lac St Jean. The XRVS 1000, rated at 25bars, is powered by a 178 Caterpillar C13 diesel and is said to be highly economical on fuel.

The Ange Gardien quarry was acquired by Beauval in in 1981 and has reserves for at least another 25 years, featuring micritic limestone and a black argillaceous slate. The site has three bench levels along the lkm long quarry andis Forexplo are drilling and blasting 8-12m deep bench heights. Depending on Beauval's requirements, Forexplo is typically drilling 56 holes for a blast to provide some 20,000tonnes. Using Atlas Copco standard or Speedbit 140mm bits, Forexplo is drilling up to 30m/h.

For more information on companies in this article

Related Content

  • The bridge to reduced traffic
    February 28, 2012
    In Zaporozhye, the industrial metropolis in Ukraine's south-east, a multi-lane cable stayed bridge is being built alongside an older viaduct. On completion, this large-scale infrastructure project will massively reduce the traffic burden on the existing bridge and significantly improve the daily traffic situation at this major river crossing.
  • Boom in Morocco's road construction materials
    February 10, 2012
    The strong road construction market in Morocco is helping boost the quarrying market in the country substantially. One such operation exists near the town of Ben Slimane, situated north of Casablanca. Agregat Oued Cherrat (AOC) owns a 65ha quarry, one of the largest of the 14 in the region and when the firm decided to buy new excavators, it also opted to buy Hitachi machines. AOC placed an order for one ZX330-3, with the second delivered three months later and the company now has three ZX330-3s, with a four
  • Concrete plants: flexibility and efficiency
    March 17, 2016
    Concrete mixing plants are becoming more flexible and innovative to ensure they meet increasingly stringent construction schedules. Increasing demands are put on contractors to cut down the transportation of material to construction sites in the name of efficiency and the environment. For that reason concrete mixing plants are increasingly flexible in their transportation to sites, their set up times and their output. Ammann Elba, the company created when German-based Elba was acquired by Ammann in 20
  • Innovations in crushing and screening technology boosting efficiency
    July 15, 2015
    The crushing and screening sector has seen a flurry of new model launches in recent months, with a series of new equipment introductions - Mike Woof writes. Crushing and screening systems play a vital role in the overall cost effectiveness of a quarrying operation. Ensuring that a quarry runs efficiently relies heavily on the appropriateness of the entire crushing and screening set-up for the material input, the output grades and the compatibility of each separate unit. Mobility has been a key issue in rece