Compressors from Atlas Copco are proving highly useful in highly diverse applications, on a bridge project and a quarry in Canada. Water ingress over 30 years has damaged a road bridge in Quebec City, Canada, deteriorating the concrete and breaking down the rubber expansion joints at both ends of the 150m long structure. City highway authority, Transportes Quebec, awarded local contracting company Inter-Structures the contract to replace the deteriorated concrete and fit new membrane seals. The bridge, clos
February 8, 2012 Read time: 3 mins
Compressors from 161 Atlas Copco are proving highly useful in highly diverse applications, on a bridge project and a quarry in Canada. Water ingress over 30 years has damaged a road bridge in Quebec City, Canada, deteriorating the concrete and breaking down the rubber expansion joints at both ends of the 150m long structure. City highway authority, Transportes Quebec, awarded local contracting company Inter-Structures the contract to replace the deteriorated concrete and fit new membrane seals. The bridge, close to the St Lawrence river and Quebec City, links highway 440 West and the Boulevard de Chutes to provide access to a residential area and the renown Montmorency park and waterfall.

To ensure access to the damaged seals across the full width of the bridge, the contractor has removed more than 300mm x 200mm x 200mm on each of the nine beams at both ends of the bridge and the 200mm thick concrete slab; relying on two Atlas Copco XAS185 air compressors, including a recently delivered unit on rental from Equipment LAV.

On the Inter-Structures project, both XAS 185 portable air compressors are supplying a free air delivery of 89litres/s at 7bars to each provide compressed air for three breakers.

Meanwhile a newly formed Canadian quarry drill and blast contractor, Forexplo, has taken delivery of a second Atlas Copco XRVS 1000 CD6 air compressor.

Formed at the beginning of the year, 2455 Forexplo has established itself as a drill and blast specialist in Canada's Quebec Province. A key factor in meeting the production targets, is the on-demand high pressure air provided by the two Atlas Copco compressors for two large drill rigs. The firm now has drill and blast contracts with Beauval for the quarries in Valleyfield, Ange Gardien, some 55km south of Montreal and Herbertville on Lac St Jean. The XRVS 1000, rated at 25bars, is powered by a 178 Caterpillar C13 diesel and is said to be highly economical on fuel.

The Ange Gardien quarry was acquired by Beauval in in 1981 and has reserves for at least another 25 years, featuring micritic limestone and a black argillaceous slate. The site has three bench levels along the lkm long quarry andis Forexplo are drilling and blasting 8-12m deep bench heights. Depending on Beauval's requirements, Forexplo is typically drilling 56 holes for a blast to provide some 20,000tonnes. Using Atlas Copco standard or Speedbit 140mm bits, Forexplo is drilling up to 30m/h.

For more information on companies in this article

Related Content

  • Revamped concrete runways now in use at Sydney Airport
    November 15, 2013
    Sydney now has a renovated airport runway thanks to contractors Antoun Civil Engineering and Volumetric Concrete Australia. The airport is a major facility as it is the international hub for airlines like Jetstar Airways and Qantas and handles around 37 million travellers each year, with almost 300,000 aircraft movements. Wear was an issue and the decision was made by the Sydney Airport Corporation Limited (SACL) to replace the concrete slabs that make up the runway system. Originally constructed in the 195
  • Excavation offering
    July 16, 2012
    There are various ways of building a tunnel, and for excavation jobs many contractors prefer to use versions of standard machines that have instead been converted to suit the confines of tunnelling applications. Some contractors opt to adapt their own units and with ventilation being an issue in underground work, engine emissions are a key focus when adapting machines. Exhaust filters and other after treatment solutions are usually required and there are an array of off-the-shelf packages available as well
  • Montreal’s critical list of deteriorating bridges and tunnels has doubled
    September 3, 2012
    The number of Montreal’s bridges and tunnels in a “critical” condition has more than doubled during the past 12 months, says a shocking new report looking at the state of the city’s transport infrastructure. The new report, which came out this month, shows that 27 of the city’s 587 highway structures reached “critical condition” in 2011 compared with only 12 in 2010.
  • Doosan’s powerful new compressor suits duties in extraction markets
    January 31, 2013
    Doosan Portable Power is offering its new large 25/280 portable compressor, which meets Stage IIIB/Tier 4 Interim emission regulations. The 25/280 portable compressor has a free air delivery of 28.3m³/min at a rated operating pressure of 25.1bar. Dual pressure regulation is a standard feature of the 25/280 compressor, allowing it to supply compressed air at operating pressures of both 25.1 or 17.2 bar. Dual pressure regulation expands the scope of applications for the 25/280 compressor which includes poweri