Skip to main content

Busway breakthrough in Brisbane

An important milestone has been reached at the Airport Link and Northern Busway (Windsor to Kedron) projects in Brisbane, Australia, with an Aker Wirth roadheader T3.20 breaking through in the 490m long Busway Tunnel at Lutwyche. The TransLink Northern Busway connects communities in Brisbane's northern suburbs to Brisbane City, major shopping centres and workplaces, and when complete it will be a vital link in the expanding busway network and will reduce travel times for people travelling to and from the su
February 8, 2012 Read time: 2 mins
Breakthrough at the Busway Tunnel in Brisbane
An important milestone has been reached at the Airport Link and Northern Busway (Windsor to Kedron) projects in Brisbane, Australia, with an 2434 Aker Wirth roadheader T3.20 breaking through in the 490m long Busway Tunnel at Lutwyche.

The TransLink Northern Busway connects communities in Brisbane's northern suburbs to Brisbane City, major shopping centres and workplaces, and when complete it will be a vital link in the expanding busway network and will reduce travel times for people travelling to and from the suburbs of Windsor, Lutwyche, Kedron, Chermside, Aspley and Bracken Ridge.

The Windsor to Kedron section, with stations at Lutwyche and Kedron, is scheduled for completion in 2012.

Four heavy-duty Aker Wirth T3.20 roadheaders, originally manufactured in Germany, are again excavating in the Brisbane area after successful completion of the Clem Jones Tunnel, which carries traffic under the Brisbane River, bypassing the city's central business district.

All four machines are equipped with 300kW powered inline cutterheads and have an operating weight of more than 130tonnes.

The roadheaders are operating in different sections of the Airport Link Tunnel project.

The 6.7km Airport Link toll road is a tunnelled motorway grade road which is under construction in the city's northern suburbs, and it will connect the Clem Jones Tunnel to the East-West Arterial Road, which leads to the Brisbane Airport. It is being built in conjunction with the Windsor to Kedron section of the Northern Busway in approximately the same corridor.

For more information on companies in this article

Related Content

  • Sandvik roadheaders working on highway project in Australia
    November 20, 2015
    Much of the excavation work for the North Connex highway tunnel project in Sydney, Australia will be carried out by roadheaders from Sandvik. In all, six MT720s, one MT620 and six MT520 machines will work on the project, in addition to six road headers from other suppliers. The work is being carried out by the Lend Lease–Bouygues Joint Venture (LLB JV) and is constructing a strategically important highway. The project is being sponsored by the NSW Government, Transurban and the M7 Westlink Shareholders.
  • Sandvik wins tunneling machine deal in Australia
    July 6, 2015
    Sandvik is supplying a major order of tunnelling machinery for use on a construction project in Australia. This deal is for a major tunnelling project in Sydney. The NSW Government, Transurban and the M7 Westlink Shareholders (the Project Sponsors) are in process to build, operate and maintain a tolled motorway linking the M1 Pacific Motorway at Wahroonga to the Hills M2 Motorway at West Pennant Hills. The new route will be called NorthConnex.
  • Melbourne’s new $20.4 billion ring road
    July 17, 2025
    Work for Melbourne’s new $20.4 billion ring road will have to be ahead of schedule.
  • Mumbai’s new coastal transport link
    July 6, 2022
    Mumbai’s new coastal road presents an ambitious and challenging project that will help improve the lives of the city’s inhabitants - Mike Woof writes