Skip to main content

Busway breakthrough in Brisbane

An important milestone has been reached at the Airport Link and Northern Busway (Windsor to Kedron) projects in Brisbane, Australia, with an Aker Wirth roadheader T3.20 breaking through in the 490m long Busway Tunnel at Lutwyche. The TransLink Northern Busway connects communities in Brisbane's northern suburbs to Brisbane City, major shopping centres and workplaces, and when complete it will be a vital link in the expanding busway network and will reduce travel times for people travelling to and from the su
February 8, 2012 Read time: 2 mins
Breakthrough at the Busway Tunnel in Brisbane
An important milestone has been reached at the Airport Link and Northern Busway (Windsor to Kedron) projects in Brisbane, Australia, with an 2434 Aker Wirth roadheader T3.20 breaking through in the 490m long Busway Tunnel at Lutwyche.

The TransLink Northern Busway connects communities in Brisbane's northern suburbs to Brisbane City, major shopping centres and workplaces, and when complete it will be a vital link in the expanding busway network and will reduce travel times for people travelling to and from the suburbs of Windsor, Lutwyche, Kedron, Chermside, Aspley and Bracken Ridge.

The Windsor to Kedron section, with stations at Lutwyche and Kedron, is scheduled for completion in 2012.

Four heavy-duty Aker Wirth T3.20 roadheaders, originally manufactured in Germany, are again excavating in the Brisbane area after successful completion of the Clem Jones Tunnel, which carries traffic under the Brisbane River, bypassing the city's central business district.

All four machines are equipped with 300kW powered inline cutterheads and have an operating weight of more than 130tonnes.

The roadheaders are operating in different sections of the Airport Link Tunnel project.

The 6.7km Airport Link toll road is a tunnelled motorway grade road which is under construction in the city's northern suburbs, and it will connect the Clem Jones Tunnel to the East-West Arterial Road, which leads to the Brisbane Airport. It is being built in conjunction with the Windsor to Kedron section of the Northern Busway in approximately the same corridor.

For more information on companies in this article

Related Content

  • Brisbane’s US$5.1-6.5 billion tunnel project
    June 24, 2024
    Brisbane could benefit from a US$5.1-6.5 billion tunnel project.
  • Managing urban motorway complexity in Sydney
    October 4, 2012
    Sydney’s Hills M2 motorway is being widened while still carrying traffic and meeting tough environmental criteria More than 100,000 vehicles and over 27,000 bus commuters use the Hills M2 motorway on a typical workday, making it one of Sydney’s busiest motorway corridors. Owned and managed by Hills Motorway Ltd (HML) and a key part of the city’s orbital motorway network, the road stretches over 21km, providing a seamless link between the Lane Cove Tunnel and Westlink M7. The Hills M2 Upgrade is one of many
  • Major Europe-Asia bridge connection in Turkey
    July 1, 2014
    The 3rd Bosporus Bridge and the Northern Marmara Motorway will improve transport links between Europe and Asia and cut chronic congestion in Istanbul, Turkey’s largest city - Mike Woof reports Work is now well underway on the 3rd Bosporus Bridge and the Northern Marmara Motorway, providing a new link for Turkish city Istanbul and the region as a whole. This enormous bridge and highway project is breaking several records for Turkey in terms of scale, as well as setting a number of international records for e
  • Tunnels eliminate bottlenecks
    February 10, 2012
    Some of the bottlenecks on the multi-lane Mittlere Ring, Munich, Germany, one of the main arterial roads circling the city centre have been eliminated by the addition of new tunnels. The Luise-Kiesselbach Square, the last section of this road improvement effort, is an important traffic hub south-west of the city where motorways A96 from Lindau and A5 from Garmisch meet, causing long delays in daily rush-hour traffic, writes Patrick Smith.