Skip to main content

Busway breakthrough in Brisbane

An important milestone has been reached at the Airport Link and Northern Busway (Windsor to Kedron) projects in Brisbane, Australia, with an Aker Wirth roadheader T3.20 breaking through in the 490m long Busway Tunnel at Lutwyche. The TransLink Northern Busway connects communities in Brisbane's northern suburbs to Brisbane City, major shopping centres and workplaces, and when complete it will be a vital link in the expanding busway network and will reduce travel times for people travelling to and from the su
February 8, 2012 Read time: 2 mins
Breakthrough at the Busway Tunnel in Brisbane
An important milestone has been reached at the Airport Link and Northern Busway (Windsor to Kedron) projects in Brisbane, Australia, with an 2434 Aker Wirth roadheader T3.20 breaking through in the 490m long Busway Tunnel at Lutwyche.

The TransLink Northern Busway connects communities in Brisbane's northern suburbs to Brisbane City, major shopping centres and workplaces, and when complete it will be a vital link in the expanding busway network and will reduce travel times for people travelling to and from the suburbs of Windsor, Lutwyche, Kedron, Chermside, Aspley and Bracken Ridge.

The Windsor to Kedron section, with stations at Lutwyche and Kedron, is scheduled for completion in 2012.

Four heavy-duty Aker Wirth T3.20 roadheaders, originally manufactured in Germany, are again excavating in the Brisbane area after successful completion of the Clem Jones Tunnel, which carries traffic under the Brisbane River, bypassing the city's central business district.

All four machines are equipped with 300kW powered inline cutterheads and have an operating weight of more than 130tonnes.

The roadheaders are operating in different sections of the Airport Link Tunnel project.

The 6.7km Airport Link toll road is a tunnelled motorway grade road which is under construction in the city's northern suburbs, and it will connect the Clem Jones Tunnel to the East-West Arterial Road, which leads to the Brisbane Airport. It is being built in conjunction with the Windsor to Kedron section of the Northern Busway in approximately the same corridor.

For more information on companies in this article

Related Content

  • Tunnel essential to reduce congestion
    February 21, 2012
    Vietnam's Ho Chi Minh City's dense population, which was estimated to be 10,680 persons/km2 in 2005, is, over the next ten years, set to benefit from the completion of the Thu Thiem Urban Area project, which will provide homes for up to 200,000 people.
  • Let’s Boogie in a new tunnel
    July 7, 2020
    The new Victory Boogie Woogie Tunnel will be the most sustainable tunnel in the Netherlands.
  • $10.1 billion South Australia road and tunnel project
    July 14, 2025
    Work is underway for a $10.1 billion South Australian road and tunnel project.
  • A 'roller coaster' ride
    July 16, 2012
    The Gold Coast region in the Australian state of Queensland is internationally renowned as a tourist area attracting thousands of visitors from Brisbane, where the state's biggest ever road and bridge upgrade project is currently underway. Some 12km of urban route on the south of the Brisbane River is being expanded to take much increased traffic levels: the north is getting a completely new 7km section of motorway on a different alignment to bypass extra traffic, and tolls are being automated to speed flow