Skip to main content

Bridging Brunei with a PmB structural waterproofing system

Pitchmastic PmB is wrapping up its bridge-deck waterproofing work on South East Asia’s longest over-sea crossing, the 30km Temburong Bridge in Brunei.
November 29, 2019 Read time: 2 mins
PmB has it covered on the US$1.2 billion Temburong Bridge project in Brunei, on the island of Borneo

Pitchmastic PmB is wrapping up its bridge-deck waterproofing work on South East Asia’s longest over-sea crossing, the 30km Temburong Bridge in Brunei.

PmB’s work started in April on the US$1.2 billion Temburong Bridge that will, when finished, connect Mengkubau and Sungai Besar in Brunei-Muara District and Labu Estate in the exclave Temburong District. Residents of Temburong will no longer have to travel through Malaysia and the local government hopes the bridge will also boost eco-tourism in the area.

The Temburong Bridge contract is the largest bridgedeck waterproofing project ever undertaken by the USL Group, parent company of Pitchmastic PmB International. It required a weekly output of around 10,000m² of the completed PmB system.

PmB protects the reinforced concrete from the effects of water and airborne contamination that would otherwise lead to corrosion and deterioration of the structure. Asphalt is easily laid on top of the PmB system.

Pitchmastic PmB International has many projects in South East Asia as well as the Middle East, including the RA214 Doha Link project - part of the strategically important Sheikh Al Jaber Ahmad Causeway in Kuwait. The project spans nearly13km from Doha to Shuwaikh and involves the supply and installation of 280,000m² of PmB. Multiple teams of Pitchmastic worked alongside highly skilled local support from the project’s main contractor, Korean giant GS Engineering and Construction.

Related Content

  • Russia's key highway development project
    February 8, 2012
    One of the largest construction programmes in Europe is being carried out to get a Russian resort ready for the Winter Olympics. Patrick Smith reports
  • Russia's key highway development project
    May 28, 2012
    One of the largest construction programmes in Europe is being carried out to get a Russian resort ready for the Winter Olympics. Patrick Smith reports. Daytime temperatures top 30°C in September, and with hundreds of shops and hotels, it is not difficult to see why Sochi has become Russia's premier holiday playground. The city, on the east coast of the Black Sea, near the border with Georgia, bustles with tourists, and this is boosted with delegates at the 9th International Investment Forum Sochi 2010.
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • Latin America invests in infrastructure growth
    February 15, 2012
    Travelling in one of the world's most diverse regions is not always easy, but spectacular engineering feats will make life easier as Patrick Smith reports. Five years ago a report from the World Bank noted that infrastructure in most of Latin America and the Caribbean (LAC) had improved over the previous ten years.