Skip to main content

Bridge improvements reduce flood threat

The impact of the new Eden Bridge over the River Eden on its flood plain is a key issue to the construction of the Carlisle Northern Development Route (CNDR).
February 16, 2012 Read time: 2 mins
A corrugated steel system from Tubosider UK was used for the culverts
The impact of the new Eden Bridge over the River Eden on its flood plain is a key issue to the construction of the Carlisle Northern Development Route (CNDR). The new 8.25km road is being built west of the city following the flooding of Carlisle in north-west England in 2005, and increased flood risk generally, The local study carried out by the 2759 Environment Agency in the wake of the 2005 floods recommended lowering the flood bank downstream by 1m and removing an old railway embankment to mitigate the future threat to Carlisle but placing added importance on the Eden plain's topography.

As a result of the flood modelling work carried out by 2762 Capita Symonds, the technical adviser managing the project for Cumbria County Council, the plan for the new bridge's northern embankment called for a series of culverts with a combined cross section of 160m².

Although the illustrative drawing featured a concrete hatched structure, design engineers Scott Wilson recommended the greater practicality and easier installation of a corrugated steel system as manufactured by 2580 Tubosider UK, also the providers of the most economical solution.

"Tubosider's bolted plate is 2309 Highways Agency-approved, sufficient to gain approval, and using its detailed plans for assembling each prefabricated component, all 15 culverts are now in place. The final solution was for ten large diameter structures of 6mm thickness and then five smaller ones of 4mm, all ranging in span from 3.32-4.46m.

It's a system 1486 Birse Civils has often used before," said design manager Bob Gibson of Birse Civils, contractors for the design and construction of the new road.

Due to open in early 2012, the CNDR will run from the A595 to M6 Junction 44 and is a £176 million (e200 million) public private partnership (PPP) concession contract run for Cumbria County Council by 1146 Balfour Beatty through its wholly-owned subsidiary Connect Roads. It will take traffic away from Carlisle centre and improve links between west Cumbria, Scotland and the north-east of England. As winning bidder, Balfour Beatty also takes control of 150km of existing road network and will maintain this for a period of 30 years.

For more information on companies in this article

Related Content

  • Balfour included on major UK Highways Agency framework contract
    November 7, 2014
    Balfour wins place on major UK Highways Agency road framework contract Balfour Beatty’s UK construction business has been appointed by the UK’s Highways Agency to a new collaborative framework contract for projects totalling more than US$3.95 billion (£2.5 billion). Under the framework arrangement, Balfour is one of five contractors that the agency can call upon to deliver individual projects worth between $160 million and $713 million (£100 million and £450 million) on Lot 3B of the Collaborative Del
  • Norway's bridge meets tough environmental targets
    May 2, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.
  • Norway's bridge meets tough environmental targets
    February 27, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.
  • Balfour wins US-70 upgrade in North Carolina
    February 14, 2023
    Balfour is already involved in the US-70 Havelock Bypass and US-70 James City projects.