Skip to main content

Bridge building with telescoping crane

German contractor König Bau has been using a new Sennebogen 643 telescopic crane for its bridge building projects. With a 30m boom, the machine places formwork units and structural elements with precision. König Bau is headquartered in Kesselsdorf, Saxony and specialises in structural engineering and special civil engineering. The company has been relying on its Sennebogen telescopic crawler crane for a range of hoisting and loading tasks required at various construction sites since September 2015. The m
March 31, 2016 Read time: 2 mins
The Sennebogen crane proved useful on a bridge project
German contractor König Bau has been using a new 2924 Sennebogen 643 telescopic crane for its bridge building projects. With a 30m boom, the machine places formwork units and structural elements with precision.

König Bau is headquartered in Kesselsdorf, Saxony and specialises in structural engineering and special civil engineering. The company has been relying on its Sennebogen telescopic crawler crane for a range of hoisting and loading tasks required at various construction sites since September 2015. The machine was supplied by sales and service partner Tecklenborg Baumaschinen and is said to offer good transportability and versatility, even in tight working spaces.

The first job for the machine was at the site of a new bridge to Hohenleipisch. The machine's continuously telescoping, 30m boom allowed the formwork elements to be placed accurately. At the same time, the machine also boasts maximum manoeuvrability thanks to its crawler tracks, allowing it to shunt and travel even under load. For the operator, not only the flexibility, but also the high stability and ability to operate the crane remotely are the major advantages versus conventional stationary cranes.

Thanks to its compact dimensions of just 9.7m in length and 3m in width when the undercarriage is retracted, the machine can be easily transported, allowing it to be moved quickly.

For more information on companies in this article

Related Content

  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • Liebherr boosts rough terrain cranes range
    January 20, 2017
    Liebherr has extended its mobile crane product range with an additional series of rough-terrain cranes in the 90tonne and 100tonne classes. The LRT 1090-2.1 and LRT 1100-2.1 feature high performance, safety and comfort, according to the manufacturer which had the series in its range in the 1980s to the mid-90s – rough-terrain cranes with a lifting capacity of 25-80tonnes with the Liebherr designation LTL.
  • Multiple roles for compact construction machines
    February 24, 2012
    Versatility remains the key for the utility equipment sector. The range of duties that compact machines can be used for continues to grow.
  • Mini excavators; versatile digging machines
    January 18, 2016
    Mini excavators represent one of the most competitive markets for utility machines and are firm favourites with rental companies