Skip to main content

Bridge building with telescoping crane

German contractor König Bau has been using a new Sennebogen 643 telescopic crane for its bridge building projects. With a 30m boom, the machine places formwork units and structural elements with precision. König Bau is headquartered in Kesselsdorf, Saxony and specialises in structural engineering and special civil engineering. The company has been relying on its Sennebogen telescopic crawler crane for a range of hoisting and loading tasks required at various construction sites since September 2015. The m
March 31, 2016 Read time: 2 mins
The Sennebogen crane proved useful on a bridge project
German contractor König Bau has been using a new 2924 Sennebogen 643 telescopic crane for its bridge building projects. With a 30m boom, the machine places formwork units and structural elements with precision.

König Bau is headquartered in Kesselsdorf, Saxony and specialises in structural engineering and special civil engineering. The company has been relying on its Sennebogen telescopic crawler crane for a range of hoisting and loading tasks required at various construction sites since September 2015. The machine was supplied by sales and service partner Tecklenborg Baumaschinen and is said to offer good transportability and versatility, even in tight working spaces.

The first job for the machine was at the site of a new bridge to Hohenleipisch. The machine's continuously telescoping, 30m boom allowed the formwork elements to be placed accurately. At the same time, the machine also boasts maximum manoeuvrability thanks to its crawler tracks, allowing it to shunt and travel even under load. For the operator, not only the flexibility, but also the high stability and ability to operate the crane remotely are the major advantages versus conventional stationary cranes.

Thanks to its compact dimensions of just 9.7m in length and 3m in width when the undercarriage is retracted, the machine can be easily transported, allowing it to be moved quickly.

For more information on companies in this article

Related Content

  • Russian firm uses crane to help bridge building
    May 5, 2015
    Russian construction company BaltMostStroy has been using a Sennebogen 7700 crawler crane to build bridges along a new freeway route The 300tonne capacity crawler crane has been used to lift prefabricated parts weighing as much as 100tonnes onto the concrete foundations. LLC Lonmadi in St Petersburg is Sennebogen’s Russian sales and service partner and supplied the contractor with the 7700 crawler crane. This versatile crawler crane is being used on demanding infrastructure construction work in Russia. A
  • Algeria bridge lifting with cranes
    January 5, 2017
    Algerian firm SAPTA is currently using four Sennebogen cranes for a bridge project close to Algerian capital Algiers. SAPTA is a specialist in bridge construction and is using the cranes, a combination of crawler and telescopic machines, to lift heavy components weighing up to 60tonnes
  • Sennebogen’s Algiers bridge
    January 21, 2013
    The Algerian SAPTA construction company, who specialise in road and traffic infrastructure construction, is using a Sennebogen 2200 crawler crane to assist with their commission to build a bridge in Algiers. Sennebogen service and sales partner EURL SM Maintenance delivered the 2200 crawler crane to SAPTA in July this year. It has since been set to work lifting, piece by piece, the steel support for the 600m long Algiers-based bridge. The crane will also be used for a range of other lifting tasks required a
  • High mobility for Sennebogen’s new crane
    April 10, 2018
    Sennebogen says that its new 670 HD crane offers a maximum 70tonne lift capacity as well as ease of transport and versatility. The heavy duty crane features a lattice boom and is part of the firm’s E-series, having been designed for use in demanding applications and with a wide variety of equipment. Customers have a choice of three engine variants, a 298kW Tier 3/Stage IIIa version and either 261kW or 321kW diesels that meet Tier 4 Final/Stage IV requirements. According to Sennebogen, the machine can be us