Skip to main content

Bridge access addition

Terex has acquired Hydra Platforms, a specialist manufacturer of access equipment designed for bridge maintenance and repair. This business is being brought into the group alongside its Bid-Well brand. The move gives Terex Roadbuilding a business that concentrates in bridge maintenance with the addition of the under-bridge access equipment to the existing range of bridge pavers, work bridges and texture/curing machines. The Hydra Platforms range includes seven hydraulically operated, self-contained units an
July 30, 2012 Read time: 2 mins
Terex is broadening its range with the addition of Hydra Platforms, a specialist manufacturer of underbridge inspection and maintenance equipment
1222 Terex has acquired Hydra Platforms, a specialist manufacturer of access equipment designed for bridge maintenance and repair. This business is being brought into the group alongside its Bid-Well brand. The move gives 3956 Terex Roadbuilding a business that concentrates in bridge maintenance with the addition of the under-bridge access equipment to the existing range of bridge pavers, work bridges and texture/curing machines.

The Hydra Platforms range includes seven hydraulically operated, self-contained units and there are two trailer-mounted models, the HP32 and HP35, with platform lengths 9.8m and 10.7m. The line-up also includes five truck-mounted units; the HPT43, HPT52, HPT55, HPT60 and HPT66 with platform lengths of 13.1-20.0m. These inspection platforms are equipped with the firm's patented, fully adjustable tower separation system. This features hydraulically adjustable cross linking arms that allow operators to adjust and move the outside tower toward the bridge fascia or extend it over obstacles without having to reposition the truck or trailer. This system also uses a crossover access platform with rails, allowing operators to safely access the unit's tower and under-bridge platform. The truck units can work from a single lane and can be moved from the platform while it is deployed by the operator.

For more information on companies in this article

Related Content

  • Boom in African road construction projects
    February 22, 2012
    Huge investments are being made in major road construction projects for North Africa. The biggest is the 'Autoroute Transmaghrébine' highway, which is also Africa's largest ever road construction project. Once complete, the highway will connect the Maghreb states of Morocco, Algeria, Tunisia and Libya and will have a total length of 3,200km.
  • Concrete paving in Indiana
    April 2, 2021
    Important concrete paving work has been carried out in Indiana on key highway connections
  • Zhejiang Jiashao Bridge Investment & Development Co
    April 6, 2017
    Located in Zhejiang Province of China, Jiashao Bridge spans the Qiantang River and connects the cities of Jiaxing and Shaoxing. The total length of the bridge project is 10.14km and carries an eight-lane expressway The Qiantang River suffers from a high flow rate of up to 7.5m/s. As the tidal range is around 7-9m, the water depth is less than 2m in time of low level tide, so ships can only move at high tide and large scale ship-lifting equipment cannot be used downstream of Jiashao Bridge. However, to
  • Terex Superlift 3800 crane rises to the challenge in Alsace
    May 14, 2015
    Crane service provider Sarens has used a Terex Superlift 3800 lattice boom crawler crane to lift a pedestrian and bicycle steel bridge over the A4 Autoroute near Schiltigheim, in the Aisace region of France. The job was out of the ordinary, according to the Sarens Group, a transport and specialised rigging specialist based in Wolvertem, Belgium. “We didn’t have a special permit for a heavy-load transport with the required weight,” said Sarens project manager Joost Elsen.