Skip to main content

Bridge access addition

Terex has acquired Hydra Platforms, a specialist manufacturer of access equipment designed for bridge maintenance and repair. This business is being brought into the group alongside its Bid-Well brand. The move gives Terex Roadbuilding a business that concentrates in bridge maintenance with the addition of the under-bridge access equipment to the existing range of bridge pavers, work bridges and texture/curing machines. The Hydra Platforms range includes seven hydraulically operated, self-contained units an
July 30, 2012 Read time: 2 mins
Terex is broadening its range with the addition of Hydra Platforms, a specialist manufacturer of underbridge inspection and maintenance equipment
1222 Terex has acquired Hydra Platforms, a specialist manufacturer of access equipment designed for bridge maintenance and repair. This business is being brought into the group alongside its Bid-Well brand. The move gives 3956 Terex Roadbuilding a business that concentrates in bridge maintenance with the addition of the under-bridge access equipment to the existing range of bridge pavers, work bridges and texture/curing machines.

The Hydra Platforms range includes seven hydraulically operated, self-contained units and there are two trailer-mounted models, the HP32 and HP35, with platform lengths 9.8m and 10.7m. The line-up also includes five truck-mounted units; the HPT43, HPT52, HPT55, HPT60 and HPT66 with platform lengths of 13.1-20.0m. These inspection platforms are equipped with the firm's patented, fully adjustable tower separation system. This features hydraulically adjustable cross linking arms that allow operators to adjust and move the outside tower toward the bridge fascia or extend it over obstacles without having to reposition the truck or trailer. This system also uses a crossover access platform with rails, allowing operators to safely access the unit's tower and under-bridge platform. The truck units can work from a single lane and can be moved from the platform while it is deployed by the operator.

For more information on companies in this article

Related Content

  • Preparations are underway for a new bridge in Venezuela
    June 25, 2013
    A large bridge project is being planned in Venezuela, with ground investigation leading the way In Venezuela, preparation work is now being carried out for a major new bridge project. The European geotechnical specialist Lankelma is supplying its Combifloat C5 jack-up platform, JUP Sandpiper, to begin work on the ground investigation for the new Puente Nigale (in English: Nigale Bridge) over Lake Maracaibo in Venezuela. The Nigale Bridge will be the second crossing over Venezuela’s largest lake. The link,
  • CET opens new laboratory to service UK’s infrastructure projects
    October 23, 2017
    With over £300 billion of investment in infrastructure planned over the next four years in the UK, materials testing firm CET is gearing up to service a lot more projects – Kristina Smith visited the newest laboratory near Heathrow to find out more. The CET Group has ambitious plans. Over the next four years it wants to double the size of its business, which in the last year turned over £27 million. “There’s a lot of positivity out there,” said Gary Corrigan, managing director of the group’s infrastructu
  • Caterpillar Paving offers a guide to efficient night time paving practices
    October 3, 2014
    Efficient night-time paving operations can reduce construction costs and cut traffic delays - *Todd Mansell writes As roads become more congested, the user cost of daytime lane closures to accommodate road construction and paving has increased dramatically. One solution to lower user costs associated with traffic delays is to carry out more paving at night during off-peak times. However night-time paving brings new challenges to producing quality work in safely.
  • Bridge inspection: destructive versus non-destructive methods
    January 6, 2015
    Tens of thousands of bridges in the United States are in desperate need of repair. But where to begin analysing their deteriorating state? Roger Roberts* investigates tips and techniques for ensuring bridge safety The average age of America’s more than 600,000 crumbling bridges is 42 years – many are 60 to 80 years old. The situation is dire, with many described as functionally obsolete, according to the American Society of Civil Engineers’ latest edition of its Report Card for America’s Infrastructure.