Skip to main content

Bridge access addition

Terex has acquired Hydra Platforms, a specialist manufacturer of access equipment designed for bridge maintenance and repair. This business is being brought into the group alongside its Bid-Well brand. The move gives Terex Roadbuilding a business that concentrates in bridge maintenance with the addition of the under-bridge access equipment to the existing range of bridge pavers, work bridges and texture/curing machines. The Hydra Platforms range includes seven hydraulically operated, self-contained units an
July 30, 2012 Read time: 2 mins
Terex is broadening its range with the addition of Hydra Platforms, a specialist manufacturer of underbridge inspection and maintenance equipment
1222 Terex has acquired Hydra Platforms, a specialist manufacturer of access equipment designed for bridge maintenance and repair. This business is being brought into the group alongside its Bid-Well brand. The move gives 3956 Terex Roadbuilding a business that concentrates in bridge maintenance with the addition of the under-bridge access equipment to the existing range of bridge pavers, work bridges and texture/curing machines.

The Hydra Platforms range includes seven hydraulically operated, self-contained units and there are two trailer-mounted models, the HP32 and HP35, with platform lengths 9.8m and 10.7m. The line-up also includes five truck-mounted units; the HPT43, HPT52, HPT55, HPT60 and HPT66 with platform lengths of 13.1-20.0m. These inspection platforms are equipped with the firm's patented, fully adjustable tower separation system. This features hydraulically adjustable cross linking arms that allow operators to adjust and move the outside tower toward the bridge fascia or extend it over obstacles without having to reposition the truck or trailer. This system also uses a crossover access platform with rails, allowing operators to safely access the unit's tower and under-bridge platform. The truck units can work from a single lane and can be moved from the platform while it is deployed by the operator.

For more information on companies in this article

Related Content

  • Brisbane's highway of distinction
    August 2, 2012
    A massive AU$2 billion update of the Gateway Motorway in Queensland is underway to improve an infrastructure stretched by population boom. Report and photographs by Adrian Greeman Just 20 years after the Australian city of Brisbane built its Gateway Motorway with a high slim signature bridge dominating the river skyline, the road is being completely revamped. Some 12km of urban route on the south of the Brisbane River is being expanded to take much increased traffic levels; the north is getting a completely
  • Hillhead-line acts for 2014 show
    July 2, 2014
    The 2014 edition of Hillhead, the three-day biennial flagship show for the quarrying, recycling and heavy construction industries, is set to welcome thousands of visitors, keen to see the latest leading equipment models alongside innovative machine and site management control technology. Guy Woodford reports on what a variety of major companies will be showcasing during this month’s show at Lafarge Tarmac’s Hillhead Quarry near Buxton in Derbyshire With around 450 UK and international suppliers of plant, eq
  • Liebherr’s truck-mounted 37 Z4 XXT concrete pump
    February 19, 2015
    A truck-mounted concrete pump configured in four sections, Liebherr’s 37 Z4 XXT’s 37m distributor boom in Z-fold design is said to be extremely torsion resistant, and consequently exhibits low-vibration boom movements on the building site. The concrete pipeline on the 37 Z4 XXT is configured close to the boom on the left and right-hand sides, guaranteeing a balanced weight distribution. The pipe bends of the concrete pipeline feature a large radius of 27.5cm ensuring minimal losses in pressure over the le
  • Liebherr’s truck-mounted 37 Z4 XXT concrete pump
    January 6, 2017
    A truck-mounted concrete pump configured in four sections, Liebherr’s 37 Z4 XXT’s 37m distributor boom in Z-fold design is said to be extremely torsion resistant, and consequently exhibits low-vibration boom movements on the building site. The concrete pipeline on the 37 Z4 XXT is configured close to the boom on the left and right-hand sides, guaranteeing a balanced weight distribution. The pipe bends of the concrete pipeline feature a large radius of 27.5cm ensuring minimal losses in pressure over the le