Skip to main content

Breakers building underground carpark in Qatar

A fleet of Rammer breakers is being used to help build a new underground car park in Qatar The underground car park will be for a dentistry and dermatology clinic in the capital, Doha. Hydraulic hammers being mentioned at the same time as a dental surgery is often associated with pain, discomfort and general unpleasantness. This is not the case in Doha, the capital of Qatar, as Rammer hammers are being used to spearhead the creation of an underground car park at a dentistry and dermatology clinic.
June 20, 2016 Read time: 2 mins
The Rammer breakers are meeting productivity targets
A fleet of 5076 Rammer breakers is being used to help build a new underground car park in Qatar

The underground car park will be for a dentistry and dermatology clinic in the capital, Doha.

Hydraulic hammers being mentioned at the same time as a dental surgery is often associated with pain, discomfort and general unpleasantness. This is not the case in Doha, the capital of Qatar, as Rammer hammers are being used to spearhead the creation of an underground car park at a dentistry and dermatology clinic.

The principle contractor on the project, 5487 Roadbridge, is using a fleet of Rammer hammers that range from a pair of 3288 models right up to a 7013. The latter being the largest unit in the Rammer range. Part of a US$10 million contract, the project requires the removal of around 350,000m3 of medium and hard limestone to create a car park space that is 200m long by 150m wide and 25m deep.

The six-month contract is being carried out by Roadbridge. Heavy breaking is carried out by the 6.2tonne Rammer 7013 which is mounted on a Volvo EC700 excavator. The firm also has a 2300 Komatsu PC600 and a 178 Caterpillar 345, each carrying a 3.9tonne Rammer 5011.   

Elsewhere on the site, a pair of JCB JS360 excavators are being used for out-breaking work using two Rammer 4099 hammers, each of which weigh in at 2.8tonnes. Lighter breaking work is charged to two more JCB excavators, both JS260 units, that are each equipped with a 2.04tonne Rammer 3288 breaker.

Despite the high temperatures, dusty conditions and long 10-hour shifts, the Rammer units have been reliable and Roadbridge reckons it will meet its target of an average production rate of 3,000m3/day throughout the work.

For more information on companies in this article

Related Content

  • Ibiza quarry relies on Cat
    July 30, 2012
    Forty years ago the father of Juan Cardona, the current owner of the quarry Cantera Can Orvay on the island of Ibiza, Spain, started extracting limestone. Today, with 20 employees and a daily output of 3,000tonnes, the company, Áridos y Prefabricados, has grown to become the biggest family owned quarry in the island. "When my father asked if I'd like to study or work, I said I'd like to work. And so I've been working here for 27 years. Since my father's retirement, I've been in charge of the quarry," Juan C
  • Crushing and screening help building Qatar’s new routes
    June 7, 2016
    Al-Mohsen Engineering in Qatar is one of the country’s leading specialists for the supply of aggregates to major construction companies. The firm is currently producing materials for many of Qatar’s infrastructure projects. Al-Mohsen is now a major player in the construction segment thanks to its ability to supply large volumes of high-quality aggregates to the market. The firm has invested in a range of Powerscreen rock crushing and screening equipment to meet the aggressive aggregates demands of huge loca
  • Sandvik drilling rigs boost production
    July 9, 2012
    The drill and blast contractor Technical Drilling and Blasting in the United Arab Emirates (UAE) is standardising on Sandvik rock tools for its fleet of drill rigs. The firm operates across Fujeirah, providing quality gabbro aggregates for construction projects in Dubai and Abu Dhabi. Recognised as one of the worlds hardest rocks, gabbro features a typical density in excess of 3tonnes/m, a crushing factor of 10 and a 61% silica content and demand remains strong for this quality construction material. Every
  • Italy road tunnel project excavated
    July 9, 2018
    Italy’s A3 Highway is being upgraded, which will improve transport between Salerno and Calabria. Upgrading Italy’s A3 highway is of prime importance for developing the south of the country and is a project that has been prioritised for construction. The A3 Salerno-Reggio-Calabria highway is a non-toll road managed by ANAS, Italy’s state-owned company that constructs and maintains highways. The route runs a total of 443km, with the road having originally been built between 1966 and 1974. However, the origina