Skip to main content

Breakers building underground carpark in Qatar

A fleet of Rammer breakers is being used to help build a new underground car park in Qatar The underground car park will be for a dentistry and dermatology clinic in the capital, Doha. Hydraulic hammers being mentioned at the same time as a dental surgery is often associated with pain, discomfort and general unpleasantness. This is not the case in Doha, the capital of Qatar, as Rammer hammers are being used to spearhead the creation of an underground car park at a dentistry and dermatology clinic.
June 20, 2016 Read time: 2 mins
The Rammer breakers are meeting productivity targets
A fleet of 5076 Rammer breakers is being used to help build a new underground car park in Qatar

The underground car park will be for a dentistry and dermatology clinic in the capital, Doha.

Hydraulic hammers being mentioned at the same time as a dental surgery is often associated with pain, discomfort and general unpleasantness. This is not the case in Doha, the capital of Qatar, as Rammer hammers are being used to spearhead the creation of an underground car park at a dentistry and dermatology clinic.

The principle contractor on the project, 5487 Roadbridge, is using a fleet of Rammer hammers that range from a pair of 3288 models right up to a 7013. The latter being the largest unit in the Rammer range. Part of a US$10 million contract, the project requires the removal of around 350,000m3 of medium and hard limestone to create a car park space that is 200m long by 150m wide and 25m deep.

The six-month contract is being carried out by Roadbridge. Heavy breaking is carried out by the 6.2tonne Rammer 7013 which is mounted on a Volvo EC700 excavator. The firm also has a 2300 Komatsu PC600 and a 178 Caterpillar 345, each carrying a 3.9tonne Rammer 5011.   

Elsewhere on the site, a pair of JCB JS360 excavators are being used for out-breaking work using two Rammer 4099 hammers, each of which weigh in at 2.8tonnes. Lighter breaking work is charged to two more JCB excavators, both JS260 units, that are each equipped with a 2.04tonne Rammer 3288 breaker.

Despite the high temperatures, dusty conditions and long 10-hour shifts, the Rammer units have been reliable and Roadbridge reckons it will meet its target of an average production rate of 3,000m3/day throughout the work.

For more information on companies in this article

Related Content

  • Latest excavators offer increased performance
    February 23, 2012
    In the more down to earth market for crawler excavators, some novel developments are coming to market. Case is upgrading two key mid-weight crawler excavator models.
  • TecnoTest’s new computerised work station can carry out large-scale testing of concrete cubes
    April 11, 2013
    A new version of TecnoTest’s computerised work station for daily, large-scale testing of concrete cubes was installed in Doha, Qatar in January this year. The KC 400/WG has been put to work for ASHGHAL, Qatar’s public works department. TecnoTest improved the work station with input from customers such as Istituto Giordano of Bellaria and ANAS, both of which have been using the original version for many years. The KC 400/WG benefits from improved software, operating system and interface and a hydraulic contr
  • Highway rebuild
    March 21, 2012
    A major contractor In Turkey is using new Dynapac pavers to resurface the busy Istanbul-Ankara highway. Onur Insaat Taahhut bought 12 new Dynapac compactors and pavers at the end of last year and is using two of its new SD135C pavers on the D-100 highway. In all 12 Dynapac asphalt paving machines and vibratory compactors were added to its fleet of equipment, and has put two of the tracked pavers to work on the Ankara to Istanbul link. The machines, four SD135C medium-sized tracked pavers, four CC524HF artic
  • Volvo-powered Man Engine to tower of Hillhead in June
    April 3, 2018
    The UK’s largest mechanical puppet, the 11m-tall Man Engine, will make a special appearance at this year’s Hillhead construction equipment exhibition. Man Engine is powered by a Volvo L220 wheeled loader on loan from Volvo CE in the UK. It will be towering over the showgrounds during the exhibition at the Hillhead Quarry near the northern English town of Buxton June 26-28. The Man Engine – a miner wearing a miner’s hat – was created to celebrate the history of mining in the south-east English county o