Skip to main content

Brazilian bridge to the beach

The State of Pernambuco in north-eastern Brazil has some of the country's most beautiful beaches, and on the peninsula of Cabo de Santo Agostinho a luxury resort has sprung up with apartments (condominios) and hotels for international tourists. To give the resort a convenient, fast link to the coastal highway, the Via Parque consortium is building a bridge over the Jaboatão River, which separates the peninsula from the mainland.
March 1, 2012 Read time: 2 mins
An impression of how the bridge will look
The State of Pernambuco in north-eastern Brazil has some of the country's most beautiful beaches, and on the peninsula of Cabo de Santo Agostinho a luxury resort has sprung up with apartments (condominios) and hotels for international tourists.

To give the resort a convenient, fast link to the coastal highway, the Via Parque consortium is building a bridge over the Jaboatão River, which separates the peninsula from the mainland.

The 320m long Ponte do Paiva across the river has a clear span of 290m, and is part of a new road system that will cut the journey from the airport to the peninsula from 48km to 14km. It will have two traffic lanes and a pedestrian and cycle lane.

The reinforced concrete box girder is being constructed using the cantilever method, working outward from the two pier heads and back-stayed in every casting section. Via Parque opted for 203 Doka Brasil to supply the formwork, and it planned and supplied a custom formwork solution that was optimally tailored to the specific requirements.

The four cantilevered forming carriages were fitted with a total of 1,000m² of large-area formwork Top 50. The formwork solution called for particular flexibility in the seventh casting section, which at 5m in length is twice as long as a typical section. Using stacking plates and 1.8m long formwork beams, it was possible to lengthen the formwork to the desired dimensions swiftly and safely.

A Doka field service technician coordinated the job of erecting the formwork solution correctly, and was on hand to assist the site team with advice and practical help throughout the start-up phase.

Although the crane had not been erected, forming operations on the foundations of the pier heads had to be started, and Doka Brasil supplied the site with the lightweight, rugged framed formwork Frami. Its low weight means that it can be shifted by hand.

"Even without crane assistance, some very good forming times were achieved with it on the site. Thanks to the logically coordinated panel formats, the crew was able to form the foundations with a minimum of prior planning," said Doka.

The site crew also used Frami on the pier-head itself.

For more information on companies in this article

Related Content

  • Ho Chi Minh City pushes ahead with Thu Thiêm Bridge 4 project
    April 18, 2017
    Authorities in Vietnam’s southern Ho Chi Minh City are seeking prime ministerial approval for the nearly 2.2km-long Thu Thiêm Bridge 4 project. The six-lane bridge will cost more than US$230 million and be a build-transfer contract, according to a report in the Vietnam Investment Review. In September, Ho Chi Minh’s City’s People’s Committee said it is considering three investors for the work - Phát Đạt Corporation Real Estate Development, Investment Corporation 620 and 168 Construction Development Investmen
  • Costa Rica concrete repairs
    February 15, 2012
    Work has started on the long awaited San Jose-Caldera Highway in Costa Rica, following numerous delays and setbacks. The new 77.5km highway will be used daily by more than 81,000 vehicles, reducing the travel time between the Central Valley and the Central Pacific Coast by at least 30 minutes.
  • Traffic control solution manufacturers win key project works
    September 26, 2013
    Traffic control system manufacturers have recently supplied some of their cutting-edge technology to major projects in Europe. Meanwhile, in southern Asia, another leading firm in the sector is helping reduce chronic traffic congestion in Indonesia’s capital, Jakarta. Guy Woodford reports Solutions supplied by Siemens Mobility & Logistics (M&L) are helping the Rijkswaterstaat improve traffic conditions at the Coentunnel in Amsterdam, one of the most heavily used traffic arteries in the Netherlands, used
  • Fast roller paver from Terex
    October 12, 2012
    Terex says that its latest Bid-Well 6500 Automatic Roller Paver delivers high performance concrete paving for slabs up to 610mm thick. The machine benefits from a heavy-duty frame design and an 8.9tonne operating weight in standard form. The frame can be configured to meet paving widths from 7.3-18.3m wide, suiting applications in a range of duties including airport runways, taxiways and aprons. Capable of width changes in a matter of hours, the roller paver offers an alternative to slipform pavers for thes