Skip to main content

Boomer offers innovations

Safety, ergonomics and high productivity have been in focus when designing the new Atlas Copco Boomer XL3 D for users who prefer a traditional direct control system, says the company.
February 17, 2012 Read time: 2 mins
The new Boomer XL3 D has been designed with safety, ergonomics and high productivity in focus.
Safety, ergonomics and high productivity have been in focus when designing the new 161 Atlas Copco Boomer XL3 D for users who prefer a traditional direct control system, says the company.

The Boomer XL3 D offers several innovations, and great emphasis has been placed on the interaction between the operator and the direct-controlled rig, which is ideal for large tunnels in civil engineering projects.

"The work space is now less noisy thanks to the improved control system that has a reduced amount of high pressure hoses near the operator," says Atlas Copco.

"The control system's hydraulics also provides improved precision and simplicity and together with the new ergonomic control panels this is advantageous for both safety and productivity. The easily accessed service points are also an important aspect of the ergonomic design." To reduce particle and nitrogen oxide emissions, the Boomer XL3 D is equipped with a Tier III engine.

"For increased productivity and precision, the rig is also prepared for the optional Feed Angle Measurement (FAM) 3, a system that helps the operator to drill precisely according to plan, resulting in considerably less over and underbreak and gives longer rounds," says Mathias Edhammer, product manager Face Drilling Rigs, Atlas Copco.

The Boomer XL3 D can be fitted with a wide range of powerful rock drills for different rock conditions, including the well-proven COP 1638, COP 1838 and the powerful COP 2238.

For more information on companies in this article

Related Content

  • Bridge and tunnel concrete testing vital for longevity
    July 9, 2012
    Modern technology is making testing more efficient and reliable, increasing productivity and reducing costs, as Patrick Smith reports A few years ago, visual inspection of an 18-year-old bridge by ARRB in Australia identified considerable cracking in the precast, prestressed deck planks as well as in the cast in situ deck overlay. Laboratory examination indicated that the deck planks and the deck overlay were suffering from a strong case of alkali-aggregate reaction (AAR). Testing of concrete cores drilled
  • Asphalt paving developments
    March 13, 2012
    US and European asphalt paving needs are different, but some firms are bridging that gap, reports Mike Woof. With a clear differentiation between the US and European asphalt paving markets, manufacturers from the latter are now developing machines aimed at the former. The US and European markets for paving machines have developed along very different lines. North American pavers are designed for high throughputs and high paving rates, having been designed to meet a need to build roads over long distances wi
  • Be more productive and accurate with Sandvik's Alpha 360 drilling tool
    July 30, 2019
    Sandvik says its new drilling tool system Alpha 360 is a reinforced and amplified version that complements the company’s Alpha 330 system. It can last twice as long as a standard thread in the industry. Its hole accuracy also enables higher productivity in tunneling and mine development, says Robert Grandin, product manager for underground top hammer, at Sandvik Rock Tools. The Alpha 360, with its strong tread design, is designed for hole diameters of 48-51mm in face drilling and bolting. The short thread
  • Advances in earthmoving are seeing new excavators and ADTs
    March 11, 2014
    Key manufacturers are introducing new excavators and ADTs featuring the latest diesel engine technology, while there are developments too in the grader sector - Mike Woof reports The start of 2014 was always going to be a key year for the construction equipment sector, given the commencement of the Tier 4 Final/Stage IV emissions regulations for North America and Europe. This phased introduction of ever tougher emissions regulations has been a long process, as well as a very costly one in terms of resear