Skip to main content

Boomer offers innovations

Safety, ergonomics and high productivity have been in focus when designing the new Atlas Copco Boomer XL3 D for users who prefer a traditional direct control system, says the company.
February 17, 2012 Read time: 2 mins
The new Boomer XL3 D has been designed with safety, ergonomics and high productivity in focus.
Safety, ergonomics and high productivity have been in focus when designing the new 161 Atlas Copco Boomer XL3 D for users who prefer a traditional direct control system, says the company.

The Boomer XL3 D offers several innovations, and great emphasis has been placed on the interaction between the operator and the direct-controlled rig, which is ideal for large tunnels in civil engineering projects.

"The work space is now less noisy thanks to the improved control system that has a reduced amount of high pressure hoses near the operator," says Atlas Copco.

"The control system's hydraulics also provides improved precision and simplicity and together with the new ergonomic control panels this is advantageous for both safety and productivity. The easily accessed service points are also an important aspect of the ergonomic design." To reduce particle and nitrogen oxide emissions, the Boomer XL3 D is equipped with a Tier III engine.

"For increased productivity and precision, the rig is also prepared for the optional Feed Angle Measurement (FAM) 3, a system that helps the operator to drill precisely according to plan, resulting in considerably less over and underbreak and gives longer rounds," says Mathias Edhammer, product manager Face Drilling Rigs, Atlas Copco.

The Boomer XL3 D can be fitted with a wide range of powerful rock drills for different rock conditions, including the well-proven COP 1638, COP 1838 and the powerful COP 2238.

For more information on companies in this article

Related Content

  • Sandvik’s Turkish delight at groundbreaking tunnel vision
    May 20, 2014
    Turkey’s longest, and what will be the world’s fourth longest, highway tunnel is being built under Mount Ovit in the northeast of the country. Sandvik Construction is playing a vital role in the construction of the giant new structure, which will enable all-year-round access to what is a relatively remote and often snow-blocked part of Anatolia Having had their freedom of movement blighted for many years by wintertime snow blocking the D925 highway, along with narrower roads and passes, at Mount Ovit, resi
  • Helsinki's tunnel project
    April 11, 2012
    A novel approach to utilities installation will lengthen the life of Helsinki's streets, reports Mike Woof A major utilities project in Finnish capital Helsinki will offer huge benefits for the city's streets and traffic flow rates in years to come. A new tunnel system is being excavated under Helsinki for the power company Helsingin Energia, although this will be co-owned by the city. Called the Common Utility Tunnel (Meilahti-Pasilak-Käpylä LU2), the excavations form an extensive network spreading out un
  • Helsinki's tunnel project
    May 9, 2012
    A novel approach to utilities installation will lengthen the life of Helsinki's streets, reports Mike Woof. A major utilities project in Finnish capital Helsinki will offer huge benefits for the city's streets and traffic flow rates in years to come. A new tunnel system is being excavated under Helsinki for the power company Helsingin Energia, although this will be co-owned by the city. Called the Common Utility Tunnel (Meilahti-Pasilak-Käpylä LU2), the excavations form an extensive network spreading out un
  • New soil compactor launches from key manufacturers
    May 30, 2013
    Major manufacturers continue to develop new soil compactor models - Mike Woof reports. Innovations in machine design are being seen in the soil compaction sector from a number of major firms. As in other equipment sectors, new engine emissions legislation has played a huge role in driving the latest design changes. Europe, the US and Japan are rolling in the new Tier 4 Final/Stage IV legislation on noise and exhaust emissions which will be phased in across power output classes from the start of January 2014