Skip to main content

BAUER involved in constructing a tunnel under the Suez Canal

The widened Suez Canal, located at Ismailia in Egypt, is now providing extra capacity for vessels, having been officially opened in August 2015. The waterway has great significance for world trade and has been widened at certain points and also expanded.
October 4, 2016 Read time: 2 mins
The new tunnel under the Suez Canal in Egypt has been constructed with the help of equipment from Bauer

The widened Suez Canal, located at Ismailia in Egypt, is now providing extra capacity for vessels, having been officially opened in August 2015. The waterway has great significance for world trade and has been widened at certain points and also expanded.

The canal connects the Mediterranean Sea with the Red Sea and is the shortest sea route from Asia to Europe. However, the reopening of the Suez Canal does not mean that all construction work on the waterway has been completed. Work is still ongoing to construct a new road tunnel that runs 25m below the bed of the Suez Canal and 70m below ground level. This is currently being built north of the city of Ismailia. 8350 BAUER Egypt, the Egyptian subsidiary of BAUER Spezialtiefbau, has been carrying out the necessary specialist foundation engineering works as subcontractor for the joint venture between Egypt based companies PETROJET and Concord for Engineering & Contracting. The project is being carried out on behalf of the Egyptian client Engineering Authority-Armed Forces-Military Engineers Administration.

For the ventilation system BAUER has driven four shafts with a depth of up to 85m and a diameter of 21m using diaphragm wall technology. In addition, Bauer has constructed a diaphragm wall around 110,000m2 in size and up to 50m deep to serve as start and target shafts for the tunnel boring machine. The scope of works also includes the construction of a soft gel blanket covering 21,250 2 and the installation of 150 temporary anchors. Among other equipment, a BAUER MC 128 and an MC 96 duty-cycle crane, both equipped with a BC 40 cutter, have been used along with two BAUER BG 28 drilling rigs.

Once it is completed in 2018, the twin-tube Ismailia road tunnel will run for some 6km underneath the Suez Canal, including the tunnel approaches.

For more information on companies in this article

Related Content

  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Mexico: underwater tunnel in Latin America
    May 8, 2015
    Mexico will benefit from an important new underwater tunnel - Mauro Nogarin writes. The city of Coatzacoalcos is located at the mouth of the river of the same name, in the Gulf of Mexico, 302km from the city of Salina Cruz, Oaxaca, in the east end of trans-isthmian corridor and at the southern end of Veracruz State. The city is seeing a key development as currently construction is 85% completed on the first immersed tube, underwater tunnel in Latin America. The reasons why experts chose this type of tunne
  • Stockholm’s new bypass
    March 8, 2021
    Tunnels make up 18km of the 21km of the Swedish capital’s E4 Bypass mega-project. It will have taken 15 years from start to opening in 2030, if all goes well