Skip to main content

Barge-mounted Manitowoc MLC300 lists Illinois bridge into place

The reduced footprint and floating counterweight meant that it is much more efficient for contractors to barge-mount a crawler crane. The crane can be on smaller water-based barges because the machine automatically adjusts its centre of gravity for each lift. Kraemer North America recently used an MLC300 to help replace an 84-year-old truss bridge, the 756m Savanna-Sabula Bridge near Savanna, in the US state of Illinois. The Savanna–Sabula Bridge was a truss bridge and causeway crossing the Mississippi Ri
June 28, 2018 Read time: 3 mins
A barge-mounted Manitowoc MLC300 at work on the new 750m-long Dale Gardner Veterans Memorial Bridge in Illinois
The reduced footprint and floating counterweight meant that it is much more efficient for contractors to barge-mount a crawler crane. The crane can be on smaller water-based barges because the machine automatically adjusts its centre of gravity for each lift.


Kraemer North America recently used an MLC300 to help replace an 84-year-old truss bridge, the 756m Savanna-Sabula Bridge near Savanna, in the US state of Illinois.

The Savanna–Sabula Bridge was a truss bridge and causeway crossing the Mississippi River to connect the city of Savanna, Illinois, with the island city of Sabula, Iowa. The bridge was decommissioned last November when its US$80 million replacement – only a few metres downstream – was opened as the 750m-long Dale Gardner Veterans Memorial Bridge.

Construction of the new bridge involved placing two 292m-long outer plate girder spans and a central 167m-long tied-arch span. Kraemer realised that a barge-mounted crane solution would be necessary to access the lifts for the tied-arch span.

The company sought consultation from Dawes Rigging & Crane Rental about a crane that could be mounted on the tight working quarters of a barge, but still provide high-capacity lifts to great heights to aid in bridge construction.

Many contractors use 2123 Manitowoc RINGER cranes for a barge-mounted solution because the round RINGER shape stabilises the crane and distributes the machine’s weight.

However, Dawes suggested a newer crane. “With the variable position counterweight, the MLC300 is always finding a new centre of gravity based on the load that’s on the hook,” said Patrick Shea, project manager for Kraemer.

“This crane has helped us to achieve almost zero list while working on the barge, keeping every lift level while minimising the barge’s rotation. The VPC saves space, too. Most crawler cranes with the required length of boom would not have fit on the barge in the first place,” said Shea.

The MLC300 was erected on a barge in the Mississippi River measuring just under 21.5m by 30m. It lifted arch rib sections weighing about 70tonnes to just over 50m using 90m of main boom. All was accomplished from a 30.5m radius.

To meet the lift radius and pick weight requirements on the job, Kraemer’s MLC300 had its optional VPC-MAX attachment. This enhances the crane’s capacity and enables additional boom and jib length combinations.

The stability of the MLC300, which Kraemer rented from Dawes Rigging & Crane Rental, was exceptional, said Shea. “The whole time we used the MLC300, the barge listed by less than a degree.”

The old Savanna–Sabula Bridge was finally demolished in March.

For more information on companies in this article

Related Content

  • First half of Renfrew Bridge arrives by barge
    May 10, 2024
    VIDEOS: Graham Construction is building the swing Renfrew Bridge for Renfrewshire Council, Scotland, as part of the €137m Clyde Waterfront and Renfrew Riverside development project.
  • Major bridge widening project going to plan
    May 2, 2012
    When built it was determined that a vital US road/rail bridge would always be widened.
  • Major bridge widening project going to plan
    April 11, 2012
    When built it was determined that a vital US road/rail bridge would always be widened. Work on that huge project is going to plan as Patrick Smith reports One of the biggest bridge widening projects in the world is being carried out under an ambitious development programme. At US$1.2 billion, the seven-year scheme to widen the Huey P. Long Bridge in the US state of Louisiana is also the largest of 16 projects planned under the state's TIMED (Transportation Infrastructure Model for Economic Development)
  • Manitowoc and Grove brands launching new designs at bauma China 2014
    November 12, 2014
    The Manitowoc Group is introducing new Potain tower cranes and Grove rough terrain cranes to the Chinese market at bauma China 2014. The two new topless tower cranes come from Manitowoc’s Potain brand and are products of the firm’s Zhangjiagang plant in China. Earlier this year the facility also celebrated the delivery of its 5,000th crane since production began in 2006. Meanwhile from the Grove range of mobile cranes will be the latest RT890E rough-terrain crane. Both machines will be on the firm’s booth a