Skip to main content

Bangladesh bridge project for XCMG cranes

Six XCMG crawler cranes are working hard on the construction of the Padma Bridge in Bangladesh. This is a landmark project for Bangladesh, as the 6.15km structure will provide a new link between the south-west of the country and the northern and eastern regions. When the bridge is complete it will connect Louhajong, Munshiganj to Shariatpur and Madaripur. In addition to the main bridge section, there is an additional 3.8km approach bridge, which is also very important to the project. The Padma Bridge is
March 7, 2018 Read time: 2 mins
Concrete beams have been lifted into position using the XCMG crawler cranes
Six 2490 XCMG crawler cranes are working hard on the construction of the Padma Bridge in Bangladesh. This is a landmark project for Bangladesh, as the 6.15km structure will provide a new link between the south-west of the country and the northern and eastern regions.


When the bridge is complete it will connect Louhajong, Munshiganj to Shariatpur and Madaripur. In addition to the main bridge section, there is an additional 3.8km approach bridge, which is also very important to the project.

The Padma Bridge is a significant transportation project and forms part of China’s Belt and Road initiative in Bangladesh. This is the largest international bridge project constructed by a Chinese enterprise and also the largest construction project in Bangladesh. When the Padma Bridge is completed, residents living on both sides of Padma River will no longer need to cross the river by ferry. The Padma Bridge will be an important channel connecting China and Pan-Asia by railway in South East Asia.

One of the most challenging aspects of constructing the Padma Bridge is the construction of its foundations. The main Padma Bridge sits on 40 main piers in total and each of these piers requires six large diameter piles. The total weight of 240 of the steel piles can reach 100,000tonnes. The piles sunk for the project include some of the deepest ever used on any construction project in the world.

According to the contractor, XCMG crawler cranes have coped well in the tough conditions, despite the difficulty of the damp, hot and and rainy environment. The machines are said to have efficiently completed jobs including lifting in concrete beams as well as hoisting reinforcement cages for the piles.

For more information on companies in this article

Related Content

  • VIDEO: Successful explosive bridge demolition in Kentucky
    July 28, 2016
    A successful explosive bridge demolition job has been carried out in the US State of Kentucky. After a short delay, demolition specialists managed to remove the old Eggners Ferry Bridge successfully and without incident. The explosives broke up the four middle spans of the structure. The demolition job was not without its challenges, with concern over the presence of nesting ospreys on the structure. Demolition personnel had to keep a distance of 90m from the nesting area, which delayed preparations.
  • XCMG boosting capacity
    January 6, 2017
    Increased manufacturing capacity has been a key focus for XCMG in recent years, with the firm having committed to upgrading its production facilities. XCMG has invested heavily in new manufacturing capacity for its ranges of cranes and wheeled loaders and both the Heavy Machinery and Wheeled Loader divisions now have new factories. The heavy crane facility produces machines in the 90tonne category and above and all production moved to the new plant in 2012 as the old factory was too small. The new facility
  • XCMG boosting capacity
    November 26, 2012
    Increased manufacturing capacity has been a key focus for XCMG in recent years, with the firm having committed to upgrading its production facilities. XCMG has invested heavily in new manufacturing capacity for its ranges of cranes and wheeled loaders and both the Heavy Machinery and Wheeled Loader divisions now have new factories. The heavy crane facility produces machines in the 90tonne category and above and all production moved to the new plant in 2012 as the old factory was too small. The new facility
  • Crane assembly for Tibet excavator
    February 9, 2017
    A tough machine assembly operation at extreme altitude has been carried out by two cranes from XCMG The cranes were used to assist in the assembly of a large excavator needed to assist in production at an extraction operation in Tibet. Located at an altitude of no less than 5,400m on the very remote Mila Mountain, the extraction sites was aiming at upgrading its operations and boosting productivity with the addition of a new 100tonne class excavator. The two cranes, an XCT100 model and a QAY300A machi