Skip to main content

Bangladesh bridge project for XCMG cranes

Six XCMG crawler cranes are working hard on the construction of the Padma Bridge in Bangladesh. This is a landmark project for Bangladesh, as the 6.15km structure will provide a new link between the south-west of the country and the northern and eastern regions. When the bridge is complete it will connect Louhajong, Munshiganj to Shariatpur and Madaripur. In addition to the main bridge section, there is an additional 3.8km approach bridge, which is also very important to the project. The Padma Bridge is
March 7, 2018 Read time: 2 mins
Concrete beams have been lifted into position using the XCMG crawler cranes
Six 2490 XCMG crawler cranes are working hard on the construction of the Padma Bridge in Bangladesh. This is a landmark project for Bangladesh, as the 6.15km structure will provide a new link between the south-west of the country and the northern and eastern regions.


When the bridge is complete it will connect Louhajong, Munshiganj to Shariatpur and Madaripur. In addition to the main bridge section, there is an additional 3.8km approach bridge, which is also very important to the project.

The Padma Bridge is a significant transportation project and forms part of China’s Belt and Road initiative in Bangladesh. This is the largest international bridge project constructed by a Chinese enterprise and also the largest construction project in Bangladesh. When the Padma Bridge is completed, residents living on both sides of Padma River will no longer need to cross the river by ferry. The Padma Bridge will be an important channel connecting China and Pan-Asia by railway in South East Asia.

One of the most challenging aspects of constructing the Padma Bridge is the construction of its foundations. The main Padma Bridge sits on 40 main piers in total and each of these piers requires six large diameter piles. The total weight of 240 of the steel piles can reach 100,000tonnes. The piles sunk for the project include some of the deepest ever used on any construction project in the world.

According to the contractor, XCMG crawler cranes have coped well in the tough conditions, despite the difficulty of the damp, hot and and rainy environment. The machines are said to have efficiently completed jobs including lifting in concrete beams as well as hoisting reinforcement cages for the piles.

For more information on companies in this article

Related Content

  • New highway building project for Manila
    June 16, 2016
    A major highway construction project is underway in the capital of the Philippines, Manila. When complete this will help cut congestion and journey times in the city, which suffers heavily from congestion. The project involves the construction of an urban highway overpass, passing through Metro Manila and stretching a length of 14km to join the NLEX highway in the north with the SLEX highway in the south. The PPP project is complex logistically, given the congested urban areas it crosses. Work commenced i
  • Key UK bridge project for A38
    October 29, 2024
    A key UK bridge project for the A38 over the HS2 route.
  • New NY Bridge - Tappan Zee - main span towers poured
    December 16, 2016
    One of the largest US infrastructure projects is nearer completion after recent topping out of the eight main span towers of the New NY Bridge. The final concrete pour was in mid-December and all piles - more than 1,000 - have been installed in Hudson River. To date, 3,000 roadway panels for the approaches - making 5.5km in length - have been installed, according to the New York State Thruway Authority, owner of the New NY Bridge project. The New NY Bridge, also called the Tappan Zee Bridge, is on tra
  • New bridge over Nile will help landlocked Uganda
    April 3, 2013
    A new River Nile bridge is essential to boost trade and improve traffic in landlocked Uganda. Shem Oirere reports A new bridge across the River Nile at Jinja, to be constructed by Uganda, is promising to boost trade in eastern Africa and pave the way for smooth and safe traffic in and out of this landlocked country. The bridge, also known as the Second Nile Bridge, is the first cable-stayed bridge in the region and will be constructed at Njeru, 80km east of the Ugandan capital Kampala, along the Kampala-Jin