Skip to main content

Bangladesh bridge project for XCMG cranes

Six XCMG crawler cranes are working hard on the construction of the Padma Bridge in Bangladesh. This is a landmark project for Bangladesh, as the 6.15km structure will provide a new link between the south-west of the country and the northern and eastern regions. When the bridge is complete it will connect Louhajong, Munshiganj to Shariatpur and Madaripur. In addition to the main bridge section, there is an additional 3.8km approach bridge, which is also very important to the project. The Padma Bridge is
March 7, 2018 Read time: 2 mins
Concrete beams have been lifted into position using the XCMG crawler cranes
Six 2490 XCMG crawler cranes are working hard on the construction of the Padma Bridge in Bangladesh. This is a landmark project for Bangladesh, as the 6.15km structure will provide a new link between the south-west of the country and the northern and eastern regions.


When the bridge is complete it will connect Louhajong, Munshiganj to Shariatpur and Madaripur. In addition to the main bridge section, there is an additional 3.8km approach bridge, which is also very important to the project.

The Padma Bridge is a significant transportation project and forms part of China’s Belt and Road initiative in Bangladesh. This is the largest international bridge project constructed by a Chinese enterprise and also the largest construction project in Bangladesh. When the Padma Bridge is completed, residents living on both sides of Padma River will no longer need to cross the river by ferry. The Padma Bridge will be an important channel connecting China and Pan-Asia by railway in South East Asia.

One of the most challenging aspects of constructing the Padma Bridge is the construction of its foundations. The main Padma Bridge sits on 40 main piers in total and each of these piers requires six large diameter piles. The total weight of 240 of the steel piles can reach 100,000tonnes. The piles sunk for the project include some of the deepest ever used on any construction project in the world.

According to the contractor, XCMG crawler cranes have coped well in the tough conditions, despite the difficulty of the damp, hot and and rainy environment. The machines are said to have efficiently completed jobs including lifting in concrete beams as well as hoisting reinforcement cages for the piles.

For more information on companies in this article

Related Content

  • Arched bridge challenge over the Oparno
    February 29, 2012
    For environmental reasons planners decided in favour of the challenging task of constructing a 13-field arched highway bridge over the Oparno Valley in the Bohemian area of the Czech Republic. The 258m bridge, whose reinforced concrete arch has a span of 135m, straddles the valley without any bridge piers, transferring the loads in the form of compressive forces into the foundations.
  • New EU-Russian highway connection
    February 18, 2013
    Among the forests and lakes of Finland, one of Europe's newest motorway links is being built as a Green highway linking Europe to Russia - Adrian Greeman reports The road eastwards from Finland's capital Helsinki, along the north coast of the Gulf of Finland, has not carried heavy traffic volumes, at least until recent times. Highway seven as it is designated locally, or E18 in European nomenclature, is partly motorway but in some sections still dual carriageway or even just a single lane each way, finishin
  • Speed and precision make for perfect tunnelling combination
    May 21, 2014
    Speed and precision have been the hallmarks of a number of major road tunnelling projects across the globe over the last 12 months, as the latest sector equipment from leading manufacturers has found itself in high demand. Guy Woodford reports Herrenknecht tunnel boring machines (TBM) have been busy tunnelling under major Chinese rivers, demonstrating phenomenal speed, top safety levels and extreme precision while playing a key role in the construction of road tunnels in the Yangtze River Delta. The Yang
  • Zhejiang Jiashao Bridge Investment & Development Co
    April 6, 2017
    Located in Zhejiang Province of China, Jiashao Bridge spans the Qiantang River and connects the cities of Jiaxing and Shaoxing. The total length of the bridge project is 10.14km and carries an eight-lane expressway The Qiantang River suffers from a high flow rate of up to 7.5m/s. As the tidal range is around 7-9m, the water depth is less than 2m in time of low level tide, so ships can only move at high tide and large scale ship-lifting equipment cannot be used downstream of Jiashao Bridge. However, to