Skip to main content

Balfour’s float drone

West Sussex County Council in the UK, in partnership with Balfour Beatty Living Places, is trialling a drone with a slight difference for bridge inspections – it floats. The floatable drone is at work on two bridges - Swan Bridge in Pulborough and Adur Ferry Bridge in Shoreham-By-Sea - saving around €9,230 over the cost of traditional inspections, according to the council and Balfour Beatty.Routine inspections are carried out on all bridges every two years.
September 1, 2017 Read time: 2 mins

West Sussex County Council in the UK, in partnership with 1146 Balfour Beatty Living Places, is trialling a drone with a slight difference for bridge inspections – it floats.

The floatable drone is at work on two bridges - Swan Bridge in Pulborough and Adur Ferry Bridge in Shoreham-By-Sea - saving around €9,230 over the cost of traditional inspections, according to the council and Balfour Beatty.

Routine inspections are carried out on all bridges every two years. Traditionally, inspection work requires traffic management to allow inspectors to safely carry out works at height and over water, causing disruption to the public and road users. The use of drones to review the condition of a bridge reduces potential health and safety risks, as well as dramatically reducing costs, disruption and inconvenience to members of the public by removing the need for traffic management.

Operated by one of Balfour Beatty’s six Civil Aviation Authority licensed drone pilots, each drone is fitted with recording equipment to allow the workforce on the ground to review the condition of the bridge once filming is completed. To make sure the drone is operated safely, a second camera is used to film the drone in action, with an assistant reviewing the safety parameters around the drone in real time.

The drones are also fitted with protective floats to enable them to safely land on water if required, as well as a GPS system to prevent them illegally flying into ‘no fly zones’, such as airport space.

For more information on companies in this article

Related Content

  • Balfour Beatty wins Scottish transport contract
    August 26, 2016
    Balfour Beatty has won a £35 million deal by Perth and Kinross Council to deliver the first phase of the Perth Transport Futures Project. Under the terms of the deal, Balfour Beatty will construct a new grade separated junction on the A9 dual carriageway as well as a new link road enabling access to development land to the west of Perth. This is the first of four phases of the Perth Transport Futures project, which aims to reduce congestion, boost transportation in the area and develop the local economy.
  • Colas UK takes Covid-19 precautions as it starts on Lincoln road contract
    April 8, 2020
    Colas is providing routine and emergency repairs for traffic signals in Lincolnshire county.
  • Lanes removes 400tonnes of debris from flood-scheme tunnel in UK
    March 28, 2017
    It was “dirty work” for drainage engineers from Lanes Group in the UK when they recently removed 400tonnes of silt and debris from a culvert in northern England. Before sludge removal started, the 3m-wide concrete box culvert under the A38 on the outskirts of the city of Derby had been full almost to its roof. Lanes Group's East Midlands depot, based in Derby, desilted the culvert in a 17-day operation for North Midland Construction, working for Highways England, under its civil engineering framework.
  • Final touches for Seattle’s SR520 floating bridge
    November 21, 2017
    Construction crews in the US state of Washington are finishing bicycle trails and pedestrian paths leading up to the award-winning SR 520 floating bridge. The Evergreen Point Floating Bridge - officially now the Governor Albert D. Rosellini Bridge - carries Washington State Route 520 across Lake Washington in Seattle. The 2.35km-long floating span is the longest floating bridge in the world and at 35m the world's widest. It opened in April last year as a replacement for the original 50-year-old four-lane