Skip to main content

Balfour’s float drone

West Sussex County Council in the UK, in partnership with Balfour Beatty Living Places, is trialling a drone with a slight difference for bridge inspections – it floats. The floatable drone is at work on two bridges - Swan Bridge in Pulborough and Adur Ferry Bridge in Shoreham-By-Sea - saving around €9,230 over the cost of traditional inspections, according to the council and Balfour Beatty.Routine inspections are carried out on all bridges every two years.
September 1, 2017 Read time: 2 mins

West Sussex County Council in the UK, in partnership with 1146 Balfour Beatty Living Places, is trialling a drone with a slight difference for bridge inspections – it floats.

The floatable drone is at work on two bridges - Swan Bridge in Pulborough and Adur Ferry Bridge in Shoreham-By-Sea - saving around €9,230 over the cost of traditional inspections, according to the council and Balfour Beatty.

Routine inspections are carried out on all bridges every two years. Traditionally, inspection work requires traffic management to allow inspectors to safely carry out works at height and over water, causing disruption to the public and road users. The use of drones to review the condition of a bridge reduces potential health and safety risks, as well as dramatically reducing costs, disruption and inconvenience to members of the public by removing the need for traffic management.

Operated by one of Balfour Beatty’s six Civil Aviation Authority licensed drone pilots, each drone is fitted with recording equipment to allow the workforce on the ground to review the condition of the bridge once filming is completed. To make sure the drone is operated safely, a second camera is used to film the drone in action, with an assistant reviewing the safety parameters around the drone in real time.

The drones are also fitted with protective floats to enable them to safely land on water if required, as well as a GPS system to prevent them illegally flying into ‘no fly zones’, such as airport space.

For more information on companies in this article

Related Content

  • Protecting bridge assets over time
    September 1, 2021
    One of the challenges facing transportation agencies today is how to conduct accurate, timely, and safe bridge inspections. Maintaining bridges is important to ensure public safety, and bridge owners and engineers need to perform regular inspections to determine the structural integrity of bridges so that they can plan for maintenance, rehabilitation, and replacement of those bridges.
  • World growth in geosynthtics set to rise
    February 17, 2012
    With geosynthetics sales set to grow rapidly in the next three years, manufacturers are preparing for the demand. Patrick Smith reports. Global demand for geosynthetics is projected to increase 5.3% annually to 4.7 billion m² in 2013 with countries such as China, India and Russia expected to post the strongest gains through the forecast period. All are building large-scale infrastructure developments and face evolving environmental protection regulations and strict building construction codes.
  • Trimble launches inspection software trio
    December 18, 2014
    An increasingly important market for engineering software providers is that of inspection solutions for civil contractors to ensure their heavy equipment is up to the job all the time. Trimble recently launched three asset inspection software solutions that allow equipment managers to easily inspect equipment in real-time using their smartphone or tablet - Trimble Inspector, Trimble Inspector Pro and Trimble Asset Manager. “The goal is to take the guesswork out of asset maintenance and put the equipment
  • Uretek delivers voided soils treatment for UK’s M3 Smart Motorway
    February 8, 2018
    Ground engineering specialist Uretek has been treating voided soils as part of maintenance following completion of the UK’s M3 Smart Motorway project. Work is between junctions 2 and 4a where Uretek has provided a non-disruptive alternative to conventional underpinning to solve foundation subsidence problems. The focus for Uretek is an old 900mm corrugated pipe, 73m long. The old pipe has had a new 700mm pipe inserted inside. However, the old pipe is rusting and rapidly deteriorating.