Skip to main content

Bachy Soletanche's interchange job

Geotechnical specialists Bachy Soletanche has started work on a new grade separated interchange on the A41 road in West Bromwich in the English Midlands for a Balfour Beatty/Birse joint venture.
February 7, 2012 Read time: 1 min
Bachy Soletanche paves the way for a new underpass to ease traffic flow
Geotechnical specialists 1485 Bachy Soletanche has started work on a new grade separated interchange on the A41 road in West Bromwich in the English Midlands for a 1146 Balfour Beatty/1486 Birse joint venture.

Worth about.£2.5 million (e2.9 million) the project consists of heavy duty CFA and cased CFA secant piling.

The hard/hard and hard/firm secant CFA piles are 600, 750 and 900mm in diameter and up to 18.5m deep, and were designed by Sandwell Metropolitan Borough Council's engineer, Scott Wilson, and include reinforced primary piles in the new overbridges wing walls.

Bachy Soletanche's biggest rig, a BG40, is being used for the cased CFA secant piles with the remainder being installed by a CM70. Once complete, the retaining walls will form the new underpass beneath the newly-aligned roundabout so as to improve traffic flow on the A41.

Paul Hodgson, business development manager at Bachy Soletanche, said: "This is our biggest job in the Midlands at the moment and it's crucial we stick to schedule so as little disruption occurs as possible."

For more information on companies in this article

Related Content

  • Mini-bridge aids Forth repairs
    July 17, 2012
    An engineering "first" means that rehabilitation work on a vital Scottish bridge built over 40 years ago can be carried out smoothly A new report to the Forth Estuary Transport Authority (FETA) in Scotland recommends appointing Balfour Beatty Civil Engineering of Edinburgh as 'preferred bidder' to carry out the scheduled replacement of the bridge's main expansion joints in 2009. However, the report to the bridge authority says the tender price of £13.7 million (US$21.3 million) is some £5 million ($7.8 mill
  • Balfour Beatty supported Road Workers’ Safety Forum wins Royal Award
    December 20, 2013
    The Road Workers' Safety Forum (RoWSaF), a cross-industry group led by the Highways Agency and supported by Balfour Beatty and its joint ventures, has been recognised at the Prince Michael International Road Safety Awards for its innovative and collaborative approach to improving safety for road workers. The RoWSaF team collected the award from His Royal Highness Prince Michael of Kent at a ceremony at The Savoy in London.
  • Balfour Beatty awarded €54.01 million A1 improvement scheme
    June 5, 2014
    Balfour Beatty has been awarded a €54.01 million (£43.9 million) contract to design and build the Highways Agency A1 Coal House to Metro Centre improvement scheme in Gateshead, north-east England. The project will include the introduction of new parallel link roads between the Lobley Hill and Gateshead Quay (A184) junctions and an increase in lane capacity on the A1 main line from two to three lanes in each direction from the Metro Centre to Coal House junction, a distance of 6.44kms.
  • Geosynthetic drainage technology developments
    June 13, 2012
    An innovative solution to providing vital, low-impact surface water control for one of Britain’s largest local authority road schemes is said to have been recently achieved using Hydro International’s (HI) Hydro Vortex Drop Shaft  ow control technology. The new 7km bypass built by Costain at Church Village, near Pontypridd, South Wales, required careful planning to minimise its effect on the countryside and the local environment. Rhondda Cynon Taff Council needed to bypass Church Village to reduce traf c