Skip to main content

Bachy Soletanche's interchange job

Geotechnical specialists Bachy Soletanche has started work on a new grade separated interchange on the A41 road in West Bromwich in the English Midlands for a Balfour Beatty/Birse joint venture.
February 7, 2012 Read time: 1 min
Bachy Soletanche paves the way for a new underpass to ease traffic flow
Geotechnical specialists 1485 Bachy Soletanche has started work on a new grade separated interchange on the A41 road in West Bromwich in the English Midlands for a 1146 Balfour Beatty/1486 Birse joint venture.

Worth about.£2.5 million (e2.9 million) the project consists of heavy duty CFA and cased CFA secant piling.

The hard/hard and hard/firm secant CFA piles are 600, 750 and 900mm in diameter and up to 18.5m deep, and were designed by Sandwell Metropolitan Borough Council's engineer, Scott Wilson, and include reinforced primary piles in the new overbridges wing walls.

Bachy Soletanche's biggest rig, a BG40, is being used for the cased CFA secant piles with the remainder being installed by a CM70. Once complete, the retaining walls will form the new underpass beneath the newly-aligned roundabout so as to improve traffic flow on the A41.

Paul Hodgson, business development manager at Bachy Soletanche, said: "This is our biggest job in the Midlands at the moment and it's crucial we stick to schedule so as little disruption occurs as possible."

For more information on companies in this article

Related Content

  • Balfour Beatty lifts bridge into place over UK’s M54
    May 14, 2014
    In the UK, Balfour Beatty has lifted a new bridge into place over the M54 motorway as part of a €14.56 million (£12 million) project to connect a new high-tech business park to the road network and to provide access for the new Jaguar Land Rover plant. The bridge, which will serve the i54 business park in South Staffordshire, was delivered for Staffordshire County Council, Wolverhampton City Council and South Staffordshire Council, as part of the Midlands Highways Alliance framework.
  • BAUER involved in constructing a tunnel under the Suez Canal
    October 4, 2016
    The widened Suez Canal, located at Ismailia in Egypt, is now providing extra capacity for vessels, having been officially opened in August 2015. The waterway has great significance for world trade and has been widened at certain points and also expanded.
  • Smart motorway project for UK’s M3
    July 23, 2014
    Balfour Beatty is to work on a €163.5 million (£129 million) upgrade project for a 21.4km stretch of the M3 motorway in the UK. The work involves upgrading the route to smart motorway status and is being carried out for the UK Government’s Highways Agency. This project will increase capacity, reduce congestion and shorten journey times for the 120,000 motorists/day using the route. This section of the motorway runs through the counties of Hampshire and Surrey, between Junction 2 which is interchange with th
  • Smart constructioon with GIS, GPS design technology
    May 2, 2012
    A UK highway project has benefited from the latest software, GIS and GPS technology, Mike Woof reports. Sophisticated software, GIS and GPS technology has played an important role in a large highway upgrade project in the UK and helping to increase efficiency and drive down construction costs.