Skip to main content

Bachy Soletanche's interchange job

Geotechnical specialists Bachy Soletanche has started work on a new grade separated interchange on the A41 road in West Bromwich in the English Midlands for a Balfour Beatty/Birse joint venture.
February 7, 2012 Read time: 1 min
Bachy Soletanche paves the way for a new underpass to ease traffic flow
Geotechnical specialists 1485 Bachy Soletanche has started work on a new grade separated interchange on the A41 road in West Bromwich in the English Midlands for a 1146 Balfour Beatty/1486 Birse joint venture.

Worth about.£2.5 million (e2.9 million) the project consists of heavy duty CFA and cased CFA secant piling.

The hard/hard and hard/firm secant CFA piles are 600, 750 and 900mm in diameter and up to 18.5m deep, and were designed by Sandwell Metropolitan Borough Council's engineer, Scott Wilson, and include reinforced primary piles in the new overbridges wing walls.

Bachy Soletanche's biggest rig, a BG40, is being used for the cased CFA secant piles with the remainder being installed by a CM70. Once complete, the retaining walls will form the new underpass beneath the newly-aligned roundabout so as to improve traffic flow on the A41.

Paul Hodgson, business development manager at Bachy Soletanche, said: "This is our biggest job in the Midlands at the moment and it's crucial we stick to schedule so as little disruption occurs as possible."

For more information on companies in this article

Related Content

  • Major Necaxa-Tihuatlan Highway project for Mexico
    October 1, 2014
    A new highway in Mexico is connecting Necaxa with Tihuatlan and the project features challenging terrain - Mauro Nogarin reports In Mexico a landmark highway project is now close to completion, having set a number of records for Latin America.
  • Balfour wins US-70 upgrade in North Carolina
    February 14, 2023
    Balfour is already involved in the US-70 Havelock Bypass and US-70 James City projects.
  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • Velocity-Balfour Beatty tackling potholes
    May 13, 2014
    It is the bugbear of motorists worldwide, and costs UK councils alone an estimated US$82.12 million (£50 million) in compensation each year. Now Balfour Beatty is partnering with specialist supplier Velocity and North Somerset Council in south-west England to tackle potholes using innovative technology which vastly reduces disruption to road users. The method, called ‘Spray Injection’ patching, is allowing Balfour Beatty to repair nearly 700 potholes a week on its highways maintenance contract repairing