Skip to main content

Bachy Soletanche's interchange job

Geotechnical specialists Bachy Soletanche has started work on a new grade separated interchange on the A41 road in West Bromwich in the English Midlands for a Balfour Beatty/Birse joint venture.
February 7, 2012 Read time: 1 min
Bachy Soletanche paves the way for a new underpass to ease traffic flow
Geotechnical specialists 1485 Bachy Soletanche has started work on a new grade separated interchange on the A41 road in West Bromwich in the English Midlands for a 1146 Balfour Beatty/1486 Birse joint venture.

Worth about.£2.5 million (e2.9 million) the project consists of heavy duty CFA and cased CFA secant piling.

The hard/hard and hard/firm secant CFA piles are 600, 750 and 900mm in diameter and up to 18.5m deep, and were designed by Sandwell Metropolitan Borough Council's engineer, Scott Wilson, and include reinforced primary piles in the new overbridges wing walls.

Bachy Soletanche's biggest rig, a BG40, is being used for the cased CFA secant piles with the remainder being installed by a CM70. Once complete, the retaining walls will form the new underpass beneath the newly-aligned roundabout so as to improve traffic flow on the A41.

Paul Hodgson, business development manager at Bachy Soletanche, said: "This is our biggest job in the Midlands at the moment and it's crucial we stick to schedule so as little disruption occurs as possible."

For more information on companies in this article

Related Content

  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public
  • Foiled by foliage
    September 5, 2022
    The fight against air pollutants along inner-city roads is growing, literally, as explained by Richard Sabin, managing director of Biotecture*
  • Stockholm’s new bypass
    March 8, 2021
    Tunnels make up 18km of the 21km of the Swedish capital’s E4 Bypass mega-project. It will have taken 15 years from start to opening in 2030, if all goes well
  • Solving congestion in Brisbane
    August 2, 2012
    Rapid growth in a major Australian city in recent years has created new problems for the infrastructure and especially transport Expansion in the city of Brisbane, the Queensland state capital and the third largest city in the country, is set to continue and some 1,500 people arrive/week from within Australia and from other parts of the world. At this rate by 2026 the city's population should increase by 1.4 million: at present it is 1.8 million. To cope, the Queensland government and city council have ini