Skip to main content

Aussie Rules for RMD Kwikform

RMD Kwikform has supplied the Abigroup with a full range of formwork, shoring and edge protection equipment for all 25 bridges on the Kurri Kurri to Branxton section of the Hunter Expressway in New South Wales (NSW) Australia.
July 1, 2013 Read time: 2 mins
A formwork solution from RMD Kwikform is being used on the Hunter Expressway in New South Wales, Australia
319 RMD Kwikform has supplied the 1362 Abigroup with a full range of formwork, shoring and edge protection equipment for all 25 bridges on the Kurri Kurri to Branxton section of the Hunter Expressway in New South Wales (NSW) Australia.

The Hunter Expressway is a US$1.7billion, 40km four-lane freeway link between the F3 Freeway near Seahampton, and the New England Highway, west of Branxton. Abigroup opted to utilise a range of RMD Australia equipment solutions for the bridge sections of the expressway, to minimise the footprint of clearing and disturbance while working near tracts of native vegetation, which provide habitats for threatened flora and fauna.

Of the project Mark Stanley, sales representative from RMD Australia, said: “We supplied a wide range of equipment to this large scale project, including innovative edge protection, access solutions, bridge abutment formwork, shoring systems, pier and headstock shoring and access equipment. We also included four cast in-situ voided bridge decks and four large spans of Paraslim composite bridge system for the bridge cantilevers.”

The formwork and shoring solutions developed for the cast in-situ structures along the Hunter Expressway were designed to cope with the changing circumstances at the sites structures, which initially slowed progress. RMD Australia developed the best method of forming these varying structures, which ensured the de_ ned budget and schedule for the project was achievable.

“Primarily we have supplied 400tonnes of Rapidshor, 100tonnes of Superslims and Alform Beam plus 100tonnes of Superslim and Alform Beam Headstock and solutions,” said Stanley. “The equipment has been designed around a number of intricate, complex structures, one of which utilises 60tonnes of the RMD Australia Paraslim system for a large span rail bridge.”

The Hunter Expressway is expected to significantly improve the efficiency of the national road network in Australia, providing a major new arterial route between Newcastle and the Upper Hunter Valley. Despite the challenges posed by working in areas subject to mine subsidence and acid sulphate soils, Abigroup is said to have been able to utilise the systems supplied by RMD Australia to progress on schedule.
Work on the Hunter Expressway is expected to be completed at the end of 2013.

For more information on companies in this article

Related Content

  • Framework solutions speed bridge construction
    February 24, 2012
    Framework plays a key role in construction of bridges and other major infrastructure works – Mike Woof writes Speeding construction processes can help reduce costs considerably and the latest formwork solutions can provide significant benefits in this regard. In many projects the use of standardized and modular formwork solutions can play a key role, reducing the planning and systems required for bridge building work.
  • Emergent markets key for formwork sector growth
    May 21, 2014
    Central and south-east Europe are hotbeds for new highway infrastructure projects utilising cutting-edge formwork solutions, while a number of leading formwork manufacturers are also looking at emergent markets for growth. Guy Woodford reports Travelling between Hungary’s capital Budapest and Southern Dalmatia now takes less time thanks to the Pan-European Corridor Vc – European route 73. Numerous tunnels and bridges are erected along the 397km stretch of the European route 73 through Bosnia owing to the
  • Upgrade for Scottish road
    February 17, 2012
    Work is progressing on a £320 million (e385 million) project to upgrade a busy 18km stretch of the main A80 Glasgow-Stirling road in Scotland to motorway standard. The project, between the villages of Stepps and Haggs, is part of a massive infrastructure investment in Scotland's transport network, and construction work includes almost 8km of new dual-lane motorway and hard shoulders between
  • Pilosio and CMC Ravenna collaborate on Cornubia Interchange
    June 4, 2019
    The South African branch of the Italian construction company CMC di Ravenna again teamed up with formwork specialist Pilosio to take advantage of Pilosio's solutions. This time it was for construction of a new bridge in the city of Durban, a project named N2/Cornubia Interchange. The overpass will streamline traffic by linking the Umhlanga industrial zone with the Cornubia new development area Tongat. Cornubia is a multibillion rand integrated settlement near Umhlanga, north of Durban, in KwaZulu Natal,