Skip to main content

Aussie Rules for RMD Kwikform

RMD Kwikform has supplied the Abigroup with a full range of formwork, shoring and edge protection equipment for all 25 bridges on the Kurri Kurri to Branxton section of the Hunter Expressway in New South Wales (NSW) Australia.
July 1, 2013 Read time: 2 mins
A formwork solution from RMD Kwikform is being used on the Hunter Expressway in New South Wales, Australia
319 RMD Kwikform has supplied the 1362 Abigroup with a full range of formwork, shoring and edge protection equipment for all 25 bridges on the Kurri Kurri to Branxton section of the Hunter Expressway in New South Wales (NSW) Australia.

The Hunter Expressway is a US$1.7billion, 40km four-lane freeway link between the F3 Freeway near Seahampton, and the New England Highway, west of Branxton. Abigroup opted to utilise a range of RMD Australia equipment solutions for the bridge sections of the expressway, to minimise the footprint of clearing and disturbance while working near tracts of native vegetation, which provide habitats for threatened flora and fauna.

Of the project Mark Stanley, sales representative from RMD Australia, said: “We supplied a wide range of equipment to this large scale project, including innovative edge protection, access solutions, bridge abutment formwork, shoring systems, pier and headstock shoring and access equipment. We also included four cast in-situ voided bridge decks and four large spans of Paraslim composite bridge system for the bridge cantilevers.”

The formwork and shoring solutions developed for the cast in-situ structures along the Hunter Expressway were designed to cope with the changing circumstances at the sites structures, which initially slowed progress. RMD Australia developed the best method of forming these varying structures, which ensured the de_ ned budget and schedule for the project was achievable.

“Primarily we have supplied 400tonnes of Rapidshor, 100tonnes of Superslims and Alform Beam plus 100tonnes of Superslim and Alform Beam Headstock and solutions,” said Stanley. “The equipment has been designed around a number of intricate, complex structures, one of which utilises 60tonnes of the RMD Australia Paraslim system for a large span rail bridge.”

The Hunter Expressway is expected to significantly improve the efficiency of the national road network in Australia, providing a major new arterial route between Newcastle and the Upper Hunter Valley. Despite the challenges posed by working in areas subject to mine subsidence and acid sulphate soils, Abigroup is said to have been able to utilise the systems supplied by RMD Australia to progress on schedule.
Work on the Hunter Expressway is expected to be completed at the end of 2013.

For more information on companies in this article

Related Content

  • Bentley’s Be Inspired Awards highlight innovation in software use
    January 6, 2015
    Innovation, from design to on-site execution, is alive and well, thanks to a good helping of software application. David Arminas reports from software developer Bentley’s annual global conference, held this year in London Successful project delivery is increasingly about hard men and women using software to get the job done and this year’s global conference in London by US-based software developer Bentley highlighted some innovative - and startling - examples. As usual, the Year in Infrastructure 2014
  • Piling starts in Parkes for bypass project
    October 20, 2023
    Two new bridges are part of the US$120 million Parkes Bypass Project in the Australian state of New South Wales.
  • Upgrade for Medieval bridge
    February 29, 2012
    One of the most demanding and challenging impressed current cathodic protection (ICCP) projects ever undertaken by specialist main contractor Concrete Repairs Ltd (CRL) is being carried out on Bideford Longbridge in County Devon, UK. The 24-span medieval masonry arch bridge spans 190m over the tidal estuary of the River Torridge.
  • The Lessons of the Genoa bridge collapse
    April 23, 2019
    The partial collapse of the Polcevera viaduct, better known as the Morandi Bridge, has prompted debate regarding the technical and administrative aspects of maintaining road infrastructures. We discussed it with the engineer Gabriele Camomilla, former Director of Research and Maintenance of the Società Autostrade, who coordinated the only major structural intervention performed on the bridge, carried out in the early 1990s