Skip to main content

Atlas Copco Meyco develops shotcreting innovation for efficiency

A new shotcreting system from Atlas Copco Meyco is said to offer considerable benefits and can boost competitiveness for customers according to the firm. The new system increases shotcreting quality, while simultaneously reducing the costs of a tunnelling job for the contractor.
November 25, 2014 Read time: 2 mins

A new shotcreting system from 161 Atlas Copco 2646 Meyco is said to offer considerable benefits and can boost competitiveness for customers according to the firm.

The new system increases shotcreting quality, while simultaneously reducing the costs of a tunnelling job for the contractor.

Product manager Christof Ziegler explained that the machine features a new design that optimises flow rate and delivery pressure during operation. Ziegler said that conventional double piston pumps used in shotcreting machines will generate pressure and flow variations at the end of each piston stroke, which affect the sprayed surface negatively. The drop in pressure and flow rate lowers quality, generating a layered effect. To prevent this from causing structural issues, contractors typically increase the thickness of the sprayed layer, boosting materials requirements and which may also necessitate additional excavation.

However the new Atlas Copco Meyco system is said to smooth out the pressure and flow rate and prevent layering. This helps cut materials use, delivering significant cost savings. With each 1kg of accelerator costing around €1 and around 2kg required/m3, the savings of around 5% can be substantial. Ziegler estimated that for a small tunnel shotcreting job for around some 25,000m3, material savings of €50,000 could be achieved. For a larger job of around 250,000m3, cost savings of €500,000 could be achieved just on materials alone.

The new equipment ensures a more accurate dosage rate of accelerator, so that the quality of the sprayed layer is further optimised according to Ziegler. He added that this prevents under-dosing for example, which can result in the concrete not achieving its required strength.

For more information on companies in this article

Related Content

  • Machine control boosting paving quality
    April 27, 2015
    The use of machine control technology on a bypass construction job has boosted quality quality control is a topic that clients as well as contractors are finding increasingly important. Control systems are being used more and more often on construction sites as a result, so as to collect data on a range of processes. This includes looking at the asphalt being supplied to site and on the quality of paving during construction. Using this data, processes can be optimised in the medium-term and, in the long-ter
  • New drilling and blasting technology aids efficient quarrying
    April 13, 2012
    Innovations in drilling and blasting and crushing and screening are bringing major economies of scale to aggregate production operations. Drilling and blasting is an area where new technology is offering major saving to quarrying companies. This is another important factor in the quarrying process, as inefficient drilling and blasting can have major financial repercussions.
  • New drilling and blasting technology aids efficient quarrying
    March 15, 2012
    Innovations in drilling and blasting and crushing and screening are bringing major economies of scale to aggregate production operations. Drilling and blasting is an area where new technology is offering major saving to quarrying companies. This is another important factor in the quarrying process, as inefficient drilling and blasting can have major financial repercussions.
  • Bridge and tunnel concrete testing vital for longevity
    July 9, 2012
    Modern technology is making testing more efficient and reliable, increasing productivity and reducing costs, as Patrick Smith reports A few years ago, visual inspection of an 18-year-old bridge by ARRB in Australia identified considerable cracking in the precast, prestressed deck planks as well as in the cast in situ deck overlay. Laboratory examination indicated that the deck planks and the deck overlay were suffering from a strong case of alkali-aggregate reaction (AAR). Testing of concrete cores drilled