Skip to main content

Arup, Mabey launch Pedesta, a modular glass-fibre polymer bridge

Arup and Mabey have launched what they claim is the first modular glass-fibre reinforced polymer footbridge, with Mabey becoming the first licensed distributor. Based on a concept by engineering design company Arup, Mabey debuted the bridge, called Pedesta, at Bridges 2017, a one-day conference and exhibition in the English city of Coventry in March. The Mabey Group specialises in the design and provision of temporary works including propping and jacking as well as environmental monitoring services, formw
May 22, 2018 Read time: 2 mins
The Pedesta bridge comes in any length to suit site requirements
Arup and Mabey have launched what they claim is the first modular glass-fibre reinforced polymer footbridge, with Mabey becoming the first licensed distributor.


Based on a concept by engineering design company 1419 Arup, Mabey debuted the bridge, called Pedesta, at Bridges 2017, a one-day conference and exhibition in the English city of Coventry in March.

The Mabey Group specialises in the design and provision of temporary works including propping and jacking as well as environmental monitoring services, formwork and falsework systems and the hire of non-mechanical groundworks equipment.

The post-tensioned Pedesta bridge can be assembled in remote or hard-to-reach sites inaccessible to large cranes and heavy machinery. Mabey said that the bridge provides a safer alternative to level crossings where traditional pedestrian bridges cannot be installed. Being 70% lighter than steel, the modules require only a pallet truck or forklift for transportation and handling, enabling faster, safer and more efficient project delivery.

The first bridge has been installed at a Site of Special Scientific Interest for Network Rail in Oxford. The bridge modules were light enough to be transported by an articulated truck, assembled on site and then lifted and positioned from a distance.


Pedesta is fully customisable its form, material, colour and finish. The material provides additional resistance to fire, graffiti, vandalism and ultraviolet radiation. It features include 1m-long identical modules fixed together with bolted shear connectors and then post-tensioned. The system allows spans of up to 30m so it can adapt to suit any application.

“We can see this bridge being useful for a whole host of global applications – from rail footbridges to road and river spans,” said Rebecca Stewart, an associate at Arup.

For more information on companies in this article

Related Content

  • Montreal’s new Champlain Bridge is shaping up for Christmas
    September 10, 2018
    Montreal’s Champlain Bridges - one going up, one coming down, reports David Arminas The importance of the new Champlain Bridge to Montreal and Canada can’t be overstated, given the crumbling nature of the not-so-old original Champlain Bridge. The original steel truss affair across the St Lawrence River and the adjacent St Lawrence Seaway canal is “a lifeline for residents and businesses” in greater Montréal, according to the national Auditor General - the public sector spending watchdog. “It accommodates
  • Arched bridge challenge over the Oparno
    February 29, 2012
    For environmental reasons planners decided in favour of the challenging task of constructing a 13-field arched highway bridge over the Oparno Valley in the Bohemian area of the Czech Republic. The 258m bridge, whose reinforced concrete arch has a span of 135m, straddles the valley without any bridge piers, transferring the loads in the form of compressive forces into the foundations.
  • Zipping up road lanes – with Barrier Systems
    September 10, 2018
    QMB has a Lindsay Road Zipper on duty near Montreal. World Highways deputy editor David Arminas climbed aboard As vice president of Canadian barrier specialist QMB, based in Laval, Quebec, Marc-Andre Seguin is sanguine about the future for moveable barriers. On the one hand, it looks good. The oft-stated advantage of moveable barriers is that the systems are cheaper to install than adding a lane or two to a highway or bridge. Directional changes to lanes can boost volume on a road without disrupting tra
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b