Skip to main content

Arup, Mabey launch Pedesta, a modular glass-fibre polymer bridge

Arup and Mabey have launched what they claim is the first modular glass-fibre reinforced polymer footbridge, with Mabey becoming the first licensed distributor. Based on a concept by engineering design company Arup, Mabey debuted the bridge, called Pedesta, at Bridges 2017, a one-day conference and exhibition in the English city of Coventry in March. The Mabey Group specialises in the design and provision of temporary works including propping and jacking as well as environmental monitoring services, formw
May 22, 2018 Read time: 2 mins
The Pedesta bridge comes in any length to suit site requirements
Arup and Mabey have launched what they claim is the first modular glass-fibre reinforced polymer footbridge, with Mabey becoming the first licensed distributor.


Based on a concept by engineering design company 1419 Arup, Mabey debuted the bridge, called Pedesta, at Bridges 2017, a one-day conference and exhibition in the English city of Coventry in March.

The Mabey Group specialises in the design and provision of temporary works including propping and jacking as well as environmental monitoring services, formwork and falsework systems and the hire of non-mechanical groundworks equipment.

The post-tensioned Pedesta bridge can be assembled in remote or hard-to-reach sites inaccessible to large cranes and heavy machinery. Mabey said that the bridge provides a safer alternative to level crossings where traditional pedestrian bridges cannot be installed. Being 70% lighter than steel, the modules require only a pallet truck or forklift for transportation and handling, enabling faster, safer and more efficient project delivery.

The first bridge has been installed at a Site of Special Scientific Interest for Network Rail in Oxford. The bridge modules were light enough to be transported by an articulated truck, assembled on site and then lifted and positioned from a distance.


Pedesta is fully customisable its form, material, colour and finish. The material provides additional resistance to fire, graffiti, vandalism and ultraviolet radiation. It features include 1m-long identical modules fixed together with bolted shear connectors and then post-tensioned. The system allows spans of up to 30m so it can adapt to suit any application.

“We can see this bridge being useful for a whole host of global applications – from rail footbridges to road and river spans,” said Rebecca Stewart, an associate at Arup.

For more information on companies in this article

Related Content

  • Peri has Polish bridge covered
    February 6, 2012
    A new bridge is being constructed across the Vistula River near Grudzi?dz, Poland, and for the foreland bridge from south-east direction, a so-called incremental launching method is being used. Two lanes, each some 556m long, are being constructed in 25 concreting cycles with standard lengths of 24m, while the formwork is 25m long and is positioned behind the bridge abutments.
  • Fischer caps it off with the FCC-B anchor
    March 12, 2025
    Variable anchoring depths of the FCC-B bridge cap anchor from German group fischer allow ideal adaptation to the acting load.
  • Doha’s massive ring road expressway project
    July 10, 2019
    The huge Doha ring road project will help decongest the city and improve transport for Qatar
  • Telematics could be an area for John Deere and Wirtgen resource sharing
    April 20, 2018
    The gods were smiling on the Wirtgen Group for the company’s Road Technology Days 2018 event. This year it was held in summer-like weather at the recently expanded Voegele plant near Mannheim in Germany. Within days the season dramatically changed from dreary chilly late winter to high temperatures, just in time to bathe the amassed demonstration equipment and the 4,000 guests in summer sunshine. But there won’t be any such dramatic changes within the Wirtgen Group, according to Domenic Ruccolo. After 28