Skip to main content

Arup, Mabey launch Pedesta, a modular glass-fibre polymer bridge

Arup and Mabey have launched what they claim is the first modular glass-fibre reinforced polymer footbridge, with Mabey becoming the first licensed distributor. Based on a concept by engineering design company Arup, Mabey debuted the bridge, called Pedesta, at Bridges 2017, a one-day conference and exhibition in the English city of Coventry in March. The Mabey Group specialises in the design and provision of temporary works including propping and jacking as well as environmental monitoring services, formw
May 22, 2018 Read time: 2 mins
The Pedesta bridge comes in any length to suit site requirements
Arup and Mabey have launched what they claim is the first modular glass-fibre reinforced polymer footbridge, with Mabey becoming the first licensed distributor.


Based on a concept by engineering design company 1419 Arup, Mabey debuted the bridge, called Pedesta, at Bridges 2017, a one-day conference and exhibition in the English city of Coventry in March.

The Mabey Group specialises in the design and provision of temporary works including propping and jacking as well as environmental monitoring services, formwork and falsework systems and the hire of non-mechanical groundworks equipment.

The post-tensioned Pedesta bridge can be assembled in remote or hard-to-reach sites inaccessible to large cranes and heavy machinery. Mabey said that the bridge provides a safer alternative to level crossings where traditional pedestrian bridges cannot be installed. Being 70% lighter than steel, the modules require only a pallet truck or forklift for transportation and handling, enabling faster, safer and more efficient project delivery.

The first bridge has been installed at a Site of Special Scientific Interest for Network Rail in Oxford. The bridge modules were light enough to be transported by an articulated truck, assembled on site and then lifted and positioned from a distance.


Pedesta is fully customisable its form, material, colour and finish. The material provides additional resistance to fire, graffiti, vandalism and ultraviolet radiation. It features include 1m-long identical modules fixed together with bolted shear connectors and then post-tensioned. The system allows spans of up to 30m so it can adapt to suit any application.

“We can see this bridge being useful for a whole host of global applications – from rail footbridges to road and river spans,” said Rebecca Stewart, an associate at Arup.

For more information on companies in this article

Related Content

  • Czech bridge sees world formwork debut
    July 23, 2012
    The Czech government is investing heavily in upgrading and modernising the country's top-tier transportation infrastructure. This year alone, building works with a total investment of over E1.6 billion are planned or underway on the Czech motorway and main road network. Completion of the D8 motorway between the Czech capital Prague and Dresden in the east of Germany has a high priority, and as part of this large-scale project, the contracting consortium of SMP and Metrostav is erecting the 585m long Prosmyk
  • Optimising Specialist Bitumen Handling with the MEST Bitutainer™
    June 1, 2025

    As roads become more advanced and surface performance expectations rise, traditional hot bitumen is no longer the only material in demand. Across the globe, highways projects are increasingly relying on high-performance binders, from polymer-modified bitumen (PMBs) to specialist emulsions and tack coats designed for specific temperature conditions or traffic volumes.

  • WJ’s Guardian stud machine to be launched in Europe
    February 23, 2018
    Stud placement just got a lot safer for road operatives in continental Europe thanks to a collaboration between the UK’s WJ Group and Belgium’s ACB. UK-based WJ Group and ACB formed their joint venture company, ACBWJ around 2006 to share product knowledge, marketing and research into thermoplastics and road markings. ACBWJ will officially launch WJ’s Guardian stud placement vehicle into the European market at the Intertraffic exhibition in Amsterdam from March 20-23.
  • Bertha ends her Alaskan Way voyage in Seattle
    December 21, 2017
    Seattle's State Route 99 viaduct is coming down. David Arminas was on site. Bertha, the world’s largest diameter earth pressure balance tunnel boring machine, with a cutterhead diameter of 17.5m, is no more. Her 2.7km journey underneath the waterfront area of Seattle finished on April 4 and the power went off for the last time on an extraordinary TBM that had finally completed an extraordinary job. “A small sidewalk job would have had more impact on city traffic than we have had,” says Brian Russell a v