Skip to main content

Air helps build bridge

Chinese contractor Shanghai Sheng Xin Construction Co is using an Atlas Copco XAS 67 compressor on a new road bridge project in Shanghai. The new bridge is at Dan Ba Road, one of the main arteries in this older part of the city.
February 13, 2012 Read time: 1 min
An Atlas Copco oil-injected rotary screw compressor is working on piling for the bridge, which will span a river in Shanghai's Pu Tuo district
Chinese contractor Shanghai Sheng Xin Construction Co is using an 161 Atlas Copco XAS 67 compressor on a new road bridge project in Shanghai. The new bridge is at Dan Ba Road, one of the main arteries in this older part of the city. The contractor is due to complete the 1km of bridge and approach roads in March of this year. The piling being used for the bridge is steel reinforced concrete as the ground here is soft and requires substantial support. After the piles are driven into the ground, a remainder remains above the surface and the bridge superstructure is mounted on top. Pneumatic hammers remove the concrete and expose the steel reinforcement, with air from the compressor then being used to blast away remaining fragments. There are around 100 piles being driven in total, with 50 on either side of the river.

For more information on companies in this article

Related Content

  • Key expressway route through Hunter Valley
    November 11, 2013
    Australia’s Hunter Valley will benefit from a new high speed expressway, which is currently under construction - Simon Gould reports Located two hours north of Sydney, the Hunter Valley region in New South Wales is one of Australia’s largest producers of coal and wine. With international demand, particularly from Asia, for both continuing to increase, a significant upgrade of infrastructure was required between the region and the port of Newcastle, the world’s largest coal export port. However the strict en
  • São Paulo's landmark bridge construction
    February 21, 2012
    To improve access from the east to São Paulo city centre, main contractor Construbase Engenharia is building a road complex comprising three viaducts and access ramps. The greatest challenge in Brazil's largest city is the showpiece Padre Adelino viaduct, a 122m long single-arch, single-span, cable-stayed concrete bridge moulded in situ with a parabola-shaped arch and a single-cell post-tensioned cantilever caisson
  • First deck span completed for Mersey Gateway's north approach viaduct
    April 4, 2016
    The Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed. Work started on site in May 2014 to build a six-lane toll bridge over the Mersey River between the towns of Runcorn and Widnes and opening is set for the autumn of 2017. As well as construction of the new bridge, works include the upgrading of 7km of highway to the north and south of the river - the main bridge is 2.2km long – and changing traffic flow so the majority of tra
  • Tough and compact
    February 15, 2012
    Atlas Copco is boosting its compressor range with the addition of a lightweight model that can be towed behind a car.