Skip to main content

AEC’s Model 6048 Bridge Deck Finisher in demand in Canada

Allen Engineering Corporation (AEC) recently delivered a Model 6048 Bridge Deck Finisher to PCR Contractors to be used on the 11km-long Rt. Hon. Herb Gray Parkway project in Canada. The US$1.4 billion highway infrastructure project is under construction in the Ontario municipalities of Windsor, LaSalle and Tecumseh. The Rt. Hon. Herb Gray Parkway will carry car and truck traffic from Hwy 401 in Canada to a new crossing across the Detroit River to I-75 in Michigan. The works will improve traffic flow at Cana
June 24, 2013 Read time: 2 mins
156 Allen Engineering Corporation (AEC) recently delivered a Model 6048 Bridge Deck Finisher to PCR Contractors to be used on the 11km-long Rt. Hon. Herb Gray Parkway project in Canada.

The US$1.4 billion highway infrastructure project is under construction in the Ontario municipalities of Windsor, LaSalle and Tecumseh. The Rt. Hon. Herb Gray Parkway will carry car and truck traffic from Hwy 401 in Canada to a new crossing across the Detroit River to I-75 in Michigan. The works will improve traffic flow at Canada’s premier trade gateway. The scale of the project’s community enhancement and environmental features are also said to be unprecedented for a highway in Ontario. The Rt. Hon. Herb Gray Parkway consists of 11 tunnels of which seven will be constructed by PCR Contractors. Because of the length and width of the tunnels, the covers were designed to be poured in transverse strips, some as wide as 48m, with each pour consuming 800 to 1,000m³ of concrete subsequently placed in three pump trucks. For covers for each of the seven tunnels the firm is constructing, PCR Contractors is required to make 33 individual pours using an Allen Bridge Deck Finisher

To accomplish these extreme pour widths, PCR Contractors is said to have relied on AEC to provide them with a 49.37m long Allen Model 6048 Bridge Deck Finisher. Allen designed this machine using their standard 1.21m deep truss system and added a transition truss system to increase the mainframe of the machine to 1.67m tall, allowing the machine to span the Model 6048’s 49.37m length.

In conjunction with finishing these extremely wide slabs, PCR also has to apply curing materials to the slabs. To accomplish this, Allen provided their Model 4834 Motorised Work Bridge with a rolling work platform attached to it. This is said to have allowed the contractor to cover the slabs with curing materials with minimal manpower.

For more information on companies in this article

Related Content

  • São Paulo's landmark bridge construction
    February 21, 2012
    To improve access from the east to São Paulo city centre, main contractor Construbase Engenharia is building a road complex comprising three viaducts and access ramps. The greatest challenge in Brazil's largest city is the showpiece Padre Adelino viaduct, a 122m long single-arch, single-span, cable-stayed concrete bridge moulded in situ with a parabola-shaped arch and a single-cell post-tensioned cantilever caisson
  • Mexico: underwater tunnel in Latin America
    May 8, 2015
    Mexico will benefit from an important new underwater tunnel - Mauro Nogarin writes. The city of Coatzacoalcos is located at the mouth of the river of the same name, in the Gulf of Mexico, 302km from the city of Salina Cruz, Oaxaca, in the east end of trans-isthmian corridor and at the southern end of Veracruz State. The city is seeing a key development as currently construction is 85% completed on the first immersed tube, underwater tunnel in Latin America. The reasons why experts chose this type of tunne
  • Airport's high demands on asphalt and concrete techniques
    July 11, 2012
    Airport runway, taxiway and parking areas make high demands on paving requirements, both with concrete and asphalt techniques. Mike Woof reports. High quality surface finishes are required in airport environments for runways, taxiways and aircraft parking areas. Because of the speed at which aircraft take off and land and the massive forces exerted due to the weight of the aircraft, particularly during landing, runway structures need to be incredibly strong. The surfaces also have to be constructed to very
  • British Columbia decides on Massey Tunnel
    August 20, 2021
    Canada’s Pacific coast province of British Columbia has announced the George Massey Tunnel replacement will be another tunnel and not a bridge as decided earlier.